Ingeniero Quimico Superior Ingeniero Industrial Superior

Experiencia

  • INGENIERO MECANICO & PROCESOS

    en EMPRESARIOS AGRUPADOS

    Marzo 2014 - Octubre 2014

    Madrid

    01/04/2014 EMPRESARIOS AGRUPADOS SRL (SPAIN COMPANY) Position: Sr Process & mechanical Engineer disciplinary Workplace: Manuela Saenz 324 Puerto Madero Buenos Aires Project 1: Combined Cycle Power Ensenada de Barragan 450 MW Project 2: Combined Cycle and Central Brigadier Lopez 230 MW Client: ENARSA ISOLUX CORSAN IECSA Project: SIEMENS GAS TURBINE SGT5-4000F,NEM , Steam Turbine SIEMENS SGen5-2000H, SCON-1000 SIEMENS CONDENSER, Auxiliaries and Mechanical Systems Electrical Equipment Control System Verification of compliance in the documentation produced in the engineering phase of the technical requirements of the tender documents and construction bidding: Verification of compliance in the documentation produced in the engineering phase of the Technical Requirements of the tender documents and construction bidding: P & I, MASS AND ENERGY BALANCE, PURCHASE ORDERS, ANALYSIS OF OFFERS, REVISION OF ENGINEERING PROVIDER , COMPLIANCE VERIFICATION OF SIEMENS

  • Jefe de Obra

    en OVEN CONSTRUCCIONES

    Septiembre 2013 - Febrero 2014

    Madrid

    30/09/2013-30/02/2014 Company: OVEN BUILDINGS Workplace: Oil Route 10 Avenue Berisso Buenos Aires Argentina Role: Project Manager Project: Y-TEC The project stands in the town of Berisso, on the Avenue Oil Argentino, in an area of 47 hectares compared to the Refinery La Plata and close to Technological Pole. The architectural program is in a building for offices and laboratories for the research and exploration of oil and gas. The plan is completed engine rooms, auditorium, reception and foyer, and programs complementary staff canteen, library, gym and costumes. A total of 11,000 m2 under construction, with the possibility of extend similar surface.

  • INGENIERO EN PROYECTO

    en INELECTRA INTERNACIONAL

    Mayo 2012 - Octubre 2012

    Madrid

    31/05/2012-05/10/2012 Company: INELECTRA PETRO TIGER INTERNATIONAL COMPANY Workplace: Bartolomé Mitre °n760 Federal Capital City Independent Buenos Aires. Function: Engineering Position: Lead Project & Process Engineer disciplinary Project: Combined Cycle Power Ashuganj 450 MW Combined Cycle Bangladesh. Client: TSK Construction Electronics, Electrical, Ashuganj Power Station Company Ltd. (APSCL). Tasks: Balance of water consumption of the unit of mass and energy, balance of the gas fuel system, HYSYS 7.0 Simulation fuel gas consumption of the unit, selection and definition of compressor power to regulate gas pressure fuel, Specification diameters lines fuel gas supply system, Technical review of the offer. Project: Combined Cycle Power Plant Client: DURO FELQUERA

  • RESPONSABLE DE INGENIERIA

    en CONSTRUCTORA NORBERTO ODEBRECHT

    Octubre 2010 - Marzo 2012

    Madrid

  • COORDINADOR DE INGENIERIA

    en SKANSKA

    Mayo 2008 - Septiembre 2009

    Madrid

  • INGENIERO PROCESOS

    en SENER

    Junio 2004 - Mayo 2008

    Madrid

Educación

  • Ingeniero Industrial

    en UTNFRLP

    2002 - 2007 (5 años) Madrid

  • ingeniero Quimico Superior

    en UTN FRBA

    1994 - 2002 (7 años) Madrid

Idiomas

  • Español Nativo

  • Francés Elemental

  • Inglés Conversación

Seguidores (1)

Colmenas