Experience

  • Field Service Specialist

    at Cameron a Schulumberger Company

    July 2018 - December 2018

    Provinsi Kalimantan Timur

     Responsible to assure that wellhead components are assembled and tested to specified requirements.  Responsible to check that the material delivered matches the material requisition form.  Confirm that all materials fit properly in the assembly, and then sign the material requisition form.  Perform pressure test according to specified test procedures.  Responsible to document each test before applying the pressure test in the log book.  Responsible to install components based on customer request, and according to specified procedures.  Prepare inspect and ensure the conditions of the equipments are in good condition.  Install Surface wellhead and X'Mastree assembly and carry out pressure tests as per procedure.  Use Casing Cold Cutter (externally & internally) - if required.  Update inventory of all tools, equipments and accessories (spare parts) on location.  Submit Service Ticket and establish good relationship with Customers

  • Field Service Supervisor

    at Halliburton Indonesia

    September 2017 - June 2018

    Provinsi Kalimantan Timur

     In charge as Field Service personnel in the field.  Responsible control Mud weight during drilling.  Responsible to check Mud property during drilling and retort analysis  Confirm that all Solid control equipment work properly .  Responsible for Daily report, Monthly report , PM sheet , Hand over to customer.  Responsible organize crew on Site  Responsible for Rig survey , make survey report for set up equipment on site.  Organize solid control equipment for rig site  Prepared job ticket for costumer  Operating CRI unit in Bp Tangguh Irian jaya in Ensco# 104 , 108  Make sure all fluid waste to be injected in dedicated waste well

  • Field Service Supervisor

    at Halliburton Saudi Arabia

    February 2014 - April 2017

    Jizan Region

     In charge as Field Service personnel in the field.  Responsible control Mud weight during drilling.  Responsible to check Mud property during drilling and retort analysis  Confirm that all Solid control equipment work properly .  Responsible for Daily report, Monthly report , PM sheet , Hand over to customer.

  • Field Service Specialist

    at Cameron Surface System

    November 2011 - May 2014

    Provinsi Kalimantan Timur

     Responsible to assure that wellhead components are assembled and tested to specified requirements.  Responsible to check that the material delivered matches the material requisition form.  Perform pressure test according to specified test procedures.  Responsible to install components based on customer request, and according to specified procedures.  Responsible to handover with customer, once the assembly is completely installed.  Install Surface wellhead and X'Mastree assembly and carry out pressure tests as per procedure.  Use Casing Cold Cutter (externally & internally) - if required.  Install Cameron’s “SSMC” (Standard Snapring Modular Compact) Such Slim-Hole, Opti-Slim, Light Architecture, Opti-Light, CSW 'Conductor Sharing Wellhead' - Use Conductor Pipe Partition Systems (CPPS) and use Beam Partition Systems

  • Field Service Supervisor

    at Scomi Oiltools

    January 2001 - November 2011

    Provinsi Kalimantan Timur

    • Solid control analysis and Reporting. • Familiar and operation Solid control equipment: such a centrifuge, cutting dryer (extractor), shaker, mud cleaner etc. • Familiar and operation deflocculated unit / chemical enhance centrifugation (CEC) • Operating filtration unit for completion fluids • Familiar and Operating Drilling Cutting Reinjection • Change Gear transmission for Centrifuge 7200 big bowl • Maintenance Centrifuge like changed main bearing and scroll bearing.Repaired Viscoterm for Centrifuge S - series • Repaired screw conveyor and change bearing

Education

  • T-Bosiet

    at Samson Tiara

    2018 - 2018 (1 year) Daerah Khusus Ibukota Jakarta

  • Degree

    at Senior Technical High School

    1997 - 2000 (3 years) Provinsi Kalimantan Timur

Languages

  • English Conversation

Hives