Experience

  • lead supervisor

    at Worleyparsons

    May 2015 - June 2019

    Muḩāfaz̧at al Aḩmadī

    As a work as responsibility For mega projects around 400km pipeline (oil.gas &water)

  • work shop superintendent

    at Combined Group,

    August 2014 - September 2015

    Muḩāfaz̧at al Aḩmadī

    Was superintendent for workshop for fabricated spools (CS – SS-DSS) And pipe support for site inside KOC

  • superintendent

    at kharafi national in Kuwait

    October 2010 - November 2014

    Muḩāfaz̧at al Aḩmadī

    Was piping Superintendent for oil&gas pipe line 24"/40"/52"/16"/48"/16" and road crossing Project :installation of FG& oil pipelines and pumping stations from MAA to ZOUR & B.S 171 / B.S 180 shuaiba power station and road crossing HDD &Microttunnling And supervision for commissioning ,responsibility for RICH GAS area inside KOC for erection steel structure installation pipe line(UG) and piping ,check valve, gate valve , instrument . and supervision for commissioning, hot tapping for life line and responsibility for work shop for fabricated all spools for site Budget : 20 million KD Contractor : Petrofac job no.ji-2003 Engineer :Flour Executed according: KOC standard

  • Mechanical Superintendent

    at FMQ. Sons Co. for pipeline construction in KSA

    May 2008 - December 2010

    Al Jawf

    I work as a Mechanical Superintendent for oil wells and water wells wellheads piping erection, installation and punch list in Kauris oilfield project for Saudi ARAMCO. Project : Kauris oilfield Mega Project as ARAMCO slandered Budget : 1200 million SR Engineer: SRACO, HUQAIT, SAUD CONSULT working as pipe line superintendent (civil & piping) activities in sweet water pipe line (68"-64"-60"-72"). Client : SWCC Contract: Yuksel Insaat Saudi Arabia

  • supervisor piping &pipeline

    at wiemr & tracht in Yemen

    May 2006 - March 2008

    Muḩāfaz̧at Dhamār

    I work as a supervisor for S.T.P and piping installation and civil engineer concrete for ponds in the waste water consumer Project : bait al faqih sewer project and treatment plant KWF grant Budget : US $ 10 million Engineer : CES (consultant engineer slizgiter)

  • general forman

    at Morganti/Aicllec Alexandria

    January 2004 - March 2006

    Muḩāfaz̧at al Iskandarīyah

    : Alexandria water general autho Egypt utilities management / Alexandria USAID grant No.263-0236 Contractor No. #3 Budget : US $ 101 million Employer : AWGA / USAID Engineer : Montgomery Watson harza (MWH) Contractor : morganti / aic llc (JOINT VENTURE) Morganti and American contractor LLC Quality control: c.c. Johnson & malhotra, P.c (CCJM) Supervising DI pipes installation with dia from 100mm to 1000mm including valve installation, and disinfection

  • forman

    at Morrison Knudsen corporation

    November 1996 - December 2003

    As Suways

    Supervising manholes and gravity sewer lines works including 1- Dewatering work, excavation work, pipe laying, backfilling, testing and pavement work (type1, 2, 3 and PVC pipes from 200 to 630. 2- Water line work including temporary and final relocation and by basing work; pipes from 13mm to50mm for GS pipes and from 100 to for PVC pipes 400mm 3- DI pipes force main including surveying, dewatering, and excavation Pipe installation, manholes and valve chambers installation, testing and final commissioning for Dia 200to300mm

  • foreman

    at Dillingham J.V bin finger & ABB Sosa

    October 1993 - September 1996

    Muḩāfaz̧at al Iskandarīyah

    Was a Forman by Dillingham functioned with the responsible for the excavation and backfill operation for both aircraft and armament shelters, was responsible for assuring that QC functions were active in the areas of his responsibility And as such functioned at a high level of competency in the performance of his duties

  • foreman

    at Elshrouk construction co.

    March 1989 - August 1993

    Beheira Governorate

    Was employed by el shrouk construction was for us the investigation borings, auger piling dewatering deep wells

  • construction technician CQC

    at fru- con

    January 1986 - October 1988

    Muḩāfaz̧at al Iskandarīyah

    On Alexandria high priority projects Was employed by fru-con construction and was technician QC lab. Project : Alexandria water general authority USAID grant no.2630270-20 Contract No. 263-C00-01-00016-00 Budget : US U$ 80 million Engineer : WWCG Contractor: fru-con Germany co. _______________________________________

Education

  • PMP

    at AUC

    2012 - 2013 (1 year) Muḩāfaz̧at al Qāhirah

  • industrial institute mechanical

    at industrial institute mechanical

    1984 - 1986 (2 years) Muḩāfaz̧at al Iskandarīyah

Services offered

  • pipeline supervisor

    Supervise and coordinate the activities of construction supervisors and engineers within assigned areas. Provide daily supervisory surveillance checks and records, ensuring that contractors' management and supervision are providing safe working conditions and permitting procedures, protective equipment, experienced / qualified supervision and manpower, with reliable, well maintained equipment to execute the contracted works as per contract schedule and targets
    Routinely study, check, review and validate the discipline scope of work against the appropriate Contract Requisition to ensure the Contractors correctly interpret and comply with the latest revision AFC drawings, quantities, and specifications

Knowledge and keywords

Languages

  • English Conversation

  • Arabic Native

Hives