Experience

  • EPC Project Manager

    at Nesma Technology

    April 2019 - at Present

    Minţaqat ar Riyāḑ

    Spearheaded number of Energy Audit of TARSHID projects from initiation completion phase. Oversaw smooth execution of retrofits. Key Contributions:  Reduced power consumption while maintaining good payback by implementing energy efficiencies measures and energy conservation measures.  Secured and maintained energy saving performance contract.  Implementing RETScreen and PVsyst.

  • Technical Manager

    at Alborj International

    March 2018 - March 2019

    Minţaqat ar Riyāḑ

    Delivered high-level of MEP technical support to FM division within Abraj al Bait complex consisting of seven towers with a Gross floor area of over 1.5M sq.m. Controlled various systems, including SCADA, medium voltage, low voltage, low current, elevators, 24 chillers (200RT each), BMS, and Hydraulics. Identified technical errors and developed new techniques to fulfil clients’ requirements. Managed latest technologies, tools, and database. Planned and directed preventive maintenance programs for successful completion of process projects. Created policies and procedures and delivered professional training to the team members. Key Contributions:  Transferred maintenance of low current systems from service providers to internal team.  Upgraded the SCADA system and train internal tam by developing innovative strategy.  Finalised a chilled water billing system that billed seven hotels inside the towers complex.

  • Service Manager/Technical Manager

    at Saudi Oger

    July 2009 - March 2019

    Makkah Province

    Led skilled team of 20 facility engineers/supervisors and 100 technicians. Maintained and operated Low current systems across facility for KAUST project consisting of 26 buildings and multiple sophisticated research labs. Executed commissioning and retro-commissioning and maintenance of building systems and MEP systems to meet requirements of ARAMCO PMT and KAUST CSD. Set plan goals while developing task lists, planed preventive maintenance, risk assessment and method statements Conducted condition survey to identify needs of repair and maintenance. Performed recruitment and interviews sessions to obtain eligible candidates. Key Contributions Constructed and maintained building automation system that controlled more than 40000 I/O HVAC and mechanical systems. Centralized control and monitoring over 20 subsystems using the Niagara AX platform Maintained and operated Simplex 4100U/GE EST3, Crestron control, Biamp audio, Barco LED screens,Extron products and conferencing systems

  • Service Manager Sustainability, 2017 to 2018

    at MACC ( but working with KAUST as SMP)

    March 2017 - March 2018

    Makkah Province

    Ensured seamless running and optimisation of all operations within KAUST facilities buildings and residential units through collaboration with teams. Developed benchmark for residential units and facility buildings. Key Contributions:  Completed upgrading of building management system within all facilities, KAUST to Siemens Desigo CC, which reduced chilled water consumptions by 20%.  Optimised energy audit, energy efficiency, and chilled water network.  Delivered number of energy retrofits projects as well as set-up Chilled water billing software.  Enabled evaluation of building performance via establishment of dashboard and reporting too

Education

  • Engineering

    at Electrical and electrinics

    1993 - 1998 (5 years)

Hives