A mechanical engineer with a wide experience in production and planning in plastic and steel structure industries with high skills in design using CAD-CAM programs seeking to further develop my career

Experience

  • production Planning and control engineer ( PPCE)

    at Zamil Steel Egypt

    January 2019 - at Present

    Muḩāfaz̧at al Jīzah

    • Working as production Planning and control engineer ( PPCE) under the leadership of PPC Manager of Zamil Steel Egypt .in a team of three PPC Engineers • My main scope is • Control the ordering of Zamil Steel all required Material and paint systems for the next three months for all production processes • Issued purchasing requests for special materials and paints • Review of all predictive projects design for the next few months before Clear it to production • Advice about scrap ratio and raw material availability • Advice about, manufacturing capability and our machining limitations, • Advice about predictive project estimate time and cost • Responsible for training new crew of engineers and students and special visitors guidance across the facility • Achievements Success in ordering all Zamil Steel material and special paints for the second half of 2019 without any issue affecting the production plan

  • production engineer and shift leader

    at Zamil Steel Egypt

    January 2018 - at Present

    Muḩāfaz̧at al Jīzah

    • Working as a production engineer and shift leader for a team consists of 50 workers, 20 operators,3 leadman at the preparation area at Zamil Steel Egypt factory • Main responsibilities • Managing the whole production process at the preparation area including three main small areas automatic BUS area, accessories area, and manual BUS area • Making sure that the production schedule is going as it’s supposed to be • Calculating the required material for every project and how to minimize scrap ratio • Segregate project into small groups of similar items according to design and push them together into the production stream to speed up the process • Manage operations and relationships between the preparation area and other factory's areas to eliminate any production delay and to eliminate any waiting time between different production areas • Eliminate any type of waste during our process

  • Production and installation engineer

    at International enginnering union

    January 2017 - January 2018

    Muḩāfaz̧at al Jīzah

    • main job responsibilities • Our main scope was to manage machines during change orders including the following • Changing the machine mold and replace it with the new mold according to the required change order, and changing mold core and cavity in the multi-product mold according to the required product size • Testing the mold cooling and heating systems before insulted the mold to the machine • Changing robots arms and install the new one which is compatible with the new mold, • Changing the machine program and create a new, adjust it to achieve the best product with the less possible weight during the start-up process, • Adjust the robot program to be at the best contact position with the mold during ejecting the product and adjust the waiting safe position for the robot during the machine cycle to eliminate any accident between robots and machine, • And at the end giving the machine to production workers after taking the quality approval of the product

Education

  • Solidworks Exper

    at CAD-CAM-CIM

    2019 - 2020 (1 year)

  • Solidworks exper

    at CAD-CAM CIM

    2019 - 2020 (1 year) Muḩāfaz̧at al Jīzah

  • bachelors of mechainical and production

    at modern academy

    2011 - 2016 (5 years) Muḩāfaz̧at al Jīzah

Services offered

  • design enginner

    using CAD-CAM-programs to design products and spare parts

Languages

  • Arabic Native

  • English Negotiation

Followers (2)

Following (70)

Hives