Experience

  • HSE Manager

    at MHT Trading and Contracting W.L.L.

    October 2017 - at Present

    Baladīyat ar Rayyān

    Project Name: Doha Metro, (10TPhase 1 Systems, Rolling Stock and Track wor) Client : QATAR RAIL Consultant: THALES, (MMHKT) Project Description: Cables pulling in the tunnel and/or wayside for telecom & signaling systems, wayside conduit including accessories installation, mechanical installation of signaling devices inside the stations at Gold Line and Red Line. Roles and Responsibilities: Coordinating the overall health, safety and environmental matters on a day to day basis according to project HSE requirements.

  • HSE Manager

    at HLG (Leighton Contracting)

    October 2015 - October 2017

    Baladīyat ar Rayyān

    Project Name : New Orbital Highway and Truck Route (P023), (Utility Package) Client : ASGHAL (PWA) PMC : KBR Supervisor Consultant : AECOM Main Contractor : HLG - Al Jaber Engineering JV Project Description : The project is located in the west and south of the Doha city and providing the New Orbital Highway connecting Mesaieed to Salwa Road. The project includes approximately 48km of the road network and a total of five interchanges. The Orbital Highway consists of 10-lane section (5 in each direction) with additional Collectors/Distributor roads, frontage roads and ramps. In addition to this, four separated truck lanes (2 in each direction) are provided starting from the tie-point with the existing interchange at Mesaieed to the project limit near to the intersection between Orbital Highway and Salwa Road.

  • HSE Manager

    at YUKSEL Construction Co. Inc.

    February 2014 - September 2015

    Baladīyat ar Rayyān

    Project Name :Qatar Rail Metro, (Red Line South Elevated and At Grade) Client : QATAR RAIL Consultant : Luis Berger and Egis JV Project Description: FCC, YUKSEL, ARCHIRODON and PETROSERV known as FYAP JV is a joint venture partnership that has been formed for the purpose of delivering the Red Line South Elevated and At Grade project is one of number concurrent projects that comprise the Qatar Integrated Railway Project (QIRP). Project is a section of the Doha metro network, a portion of Qatar integrated rail project (QIRP). The RLSEAG works between at Chainage 0+565 - 6+391. The project comprises of the following works;  Qatar Economic Zone, Barwa Village Station, Al Wakra North Station  Metro Alignment km 0+565 to km 1+040  Elevated Section and At-Grade Section  Highway Works (Underpass), etc.

  • HSE Manager

    at YUKSEL Construction Co. Inc.

    October 2013 - February 2014

    Baladīyat ar Rayyān

    Project Name : Construction Package 4 (CP4) - Lusail Development for Primary Infrastructure Road A1, A6, Southern & Marina Interchanges Client : LREDC (Lusail Real Estate Development Company) Consultant : QPM (Qatar Project Management) Project Description: The scope of work includes the upgrading of the existing road provides a free four lane in each direction for mainline traffic. The local traffic will be served through a continuous service road network providing a safe and efficient movement between the mainline traffic to adjacent existing facilities along the route. Parking will be provided on both sides of the service roads to serve the adjacent facilities. The work will include but not limited to: • Construction of 6 signalized grade separated interchanges along Road A1, A6, A10 and D11 with 6 underpasses along the mainline at intersections with Junction 12,13 and 14, Wadi, Marina and Southern.

  • HSE Manager

    at YUKSEL Construction Co. Inc.

    January 2013 - October 2013

    Ankara

    Maintain and develop Health and Safety Management system at Head Office on the corporate level and on the project level in and out of Turkey. - Gebze – Orhangazi – İzmir (İzmit Gulf Passage Bridge and Access Roads) at the General Directorate of Highways, Turkey - Kora – Shaqlawa – Qandeel Highway, North Irak - Dammam University Construction of Infrastructure Phase-3 (Under Pass Project), Saudi Arabia - Construction of Ordu Ring Road, Highway, Turkey - K. Maras, Sariguzel and Kandil Dam and HEPP (Hydro Electric Power Plant), Turkey

  • HSE Manager

    at C.A.T. International Qatar W.L.L.

    April 2010 - January 2013

    Baladīyat ar Rayyān

    Project Name : Msheireb-Downtown Doha Project, Phase-1A Infrastructure Work, Client : MSHEIREB PROPERTIES (DOHALAND) Consultant : TURNER (TiME QATAR) Project Description : The Heart of Doha Development is located close to the historical origins of Qatar’s capital city next to the “Amiri Diwan”, in Doha, Qatar. The Project is the development and regeneration of 35 hectares in Inner Doha. The development will be phased, five distinct phases have been identified, (Phase 1A, 1B, 1C, 2, 3 and 4), works include demolition of areas for new buildings and preservation of heritage buildings. The Heart of Doha is a mixed-used development comprising, Retail, Commercial, Residential, Hotel, Cultural and community Facilities.

  • HSE Manager

    at HANDAR Eng. & Cont. W.L.L

    July 2009 - April 2010

    Baladīyat ar Rayyān

    Project Name : NDIA Project, CP-18: Passenger Terminal Building Client : NDIA Steering Committee (New Doha International Airport) Consultant : OBI (Overseas BECHTEL Inc.) Main Contractor : SKYORYX-JV (TAISEI-TAV)

  • HSE Manager

    at YUKSEL Construction Co. Inc.

    June 2007 - July 2009

    Baladīyat ar Rayyān

    Project Name: North / South Extensions to Ras Abu Abboud Road (11T14TRoadworks & Runways) Client :New Doha International Airport Consultants :Maunsell / SALFO & Associates10T13T Project Description: The project comprises the upgrade of the existing two interchanges at Ras Abu Abboud (RAA), linking the Inner City Corniche and C-ring road to the New International Airport. RAAR project provided a four to five lane free flow carriageway with service lanes serving to restricted areas. RAAR Interchange provides a two lane directional link tunnel servicing traffic from AL Corniche to RAAR heading towards Hamad International Airport (HIA). The existing East/West Bridge at RAAR Junction with C-Ring Road/Al Corniche has been reconstructed to dual three lane carriageway. The works also consist of the construction of an underpass serving both the Naval Base and the Marriott Hotel area in addition to the South Extension, a 600 m stretch of dual four lane expressway.

  • Deputy HSE Manager

    at GAMA Industrial Inc.,

    February 2006 - January 2007

    Baladīyat Umm Şalāl

    Project Name: Site Preparation Work at Ras Gas Onshore Expansions Project Phase 2.and Qatar Gas-3&4, Onshore LNG Project in Ras Laffan. Consultant : (CTJV) Chiyoda Technip Joint Venture). Client : RAS GAS and QATAR GAS

  • HSE Manager

    at YUKSEL Construction Co. Inc.

    July 2004 - January 2006

    Wardak

    Project Name: Kabul – Gardez Secondary Road Km.3 – 45. Shash Darak US Embassy By-Pass Road and Kabul Airport Road Project. Client : (LBGI) Louis Berger Group Inc., Washington DC, USA.

  • HSE Engineer

    at STRABAG AG,

    September 2000 - July 2003

    Artvin

    Project Name: Borcka Dam & HEPP, Muratli Dam & HEPP (Road Tunnels, Diversion Tunnels, Galleries and Intake, Penstock, Powerhouse, Spillway as construction buildings). Client : General Directorate Of State Hydraulic Works in Turkey (DSI).

Education

  • NEBOSH DIPLOMA UNIT A

    at NEBOSH

    2016 - 2016 (1 year)

  • “A” Class HSE Specialist

    at Ministry of Labor and Social Security

    2013 - 2014 (1 year) Ankara

  • NEBOSH IGC

    at NEBOSH

    2011 - 2011 (1 year) Baladīyat ar Rayyān

  • Managing Safely

    at IOSH

    2011 - 2011 (1 year)

  • OHSAS 18001:2007 Internal Auditor

    at OHSAS

    2010 - 2010 (1 year) Baladīyat ar Rayyān

  • OSHA 10-Hour

    at OSHA

    2010 - 2010 (1 year)

  • PBS (People Based Safety)

    at BECHTEL

    2008 - 2008 (1 year)

  • Bachelor Science (Civil Engineer)

    at Eastern Mediterranean University

    1994 - 2000 (6 years) Eparchía Lefkosías

Languages

  • English Negotiation

  • Turkish Native

Followers (1)

Hives