Experience

  • Business Development Manager

    at JST Group

    April 2019 - at Present

    Bangkok

    - Provide consultant to DMF (Department of Mineral and Fuel) on P&A Decommissioning Guidelines. - Develop and maintain business opportunities in many principles such as Abrasive Cutter, Offshore Crane, Waste Effluent Treatment, and etc

  • Senior Drilling Engineer

    at Chevron

    January 2018 - March 2019

    Bangkok

    - Planned successful Asset Retirement P&A Projects with complicated barrier installation and remedial work, multi-casing corrosion, multiple well construction types. - Advised other drilling engineers on difficult P&A Projects such as subsea tieback wells, ESP wells and wells with complicated barrier placement requirements. Owner of all Chevron Thailand P&A Procedure templates. - Revamped procedures to save $150-210k/well; approximately 300 wells to date. - Planned difficult Infill drilling projects with challenges on pore pressure uncertainties, high mud weights, high loss circulation risk, platform load limits, difficult P&A activities, multiple rig and schedule changes. - Process SME on Uncertainty Management, Risk Assessment and Management of Change.

  • Night Drilling Supervisor

    at Chevron

    January 2016 - December 2017

    Bangkok

    - Led over 150 personnel on board as Night Drilling Supervisor for 2 years to execute challenging Drilling and P&A projects safely and efficiently. - Mentor trainees, and business partners on both Technical and Soft skills. Created a strong Safety Attitude and Team-Family atmosphere to encourage performance, efficiency and job satisfaction. - Led safety engagement campaigns; Hand Safety Project, 1 Idea Campaign, Hazard Hunts, Verification and Validation, etc. - Led Risk Assessment that minimized shipyard work requirements that resulted in saving $3.75 MM USD

  • Drilling Engineer

    at Chevron

    June 2010 - December 2015

    Bangkok

    - Planned drilling projects with challenging SIMOPs activities, high temperatures, pore pressure uncertainties, extreme collision risks, etc. - Received Recognition Award for eliminating Production Loss of 84 MBOE or $4.6 MM USD on one project by managing SIMOPs. - Introduced, planned and executed trials and disseminated a new LCM product as a new standard across the rig fleet. - Drove development and deployment of new wireline Electric Cable Head Release Device with a stronger Weak Point to eliminate tool stuck events; down from 16 to 0 in a year. (SPE 168281); Savings $16 MM USD/year. - First Business Continuity SME for Chevron Thailand Drilling Department.

  • Wireline Engineer

    at Halliburton

    August 2004 - May 2010

    Changwat Songkhla

    - Managed, prepared, checked logging tools & logging unit in workshop. - Supervised the open hole logging of 2+ runs per well in 150 wells in the Gulf of Thailand generating over $15 MM USD in revenue. - Perforated over 40 wells. - Supervised and ran a 3 day Explosive Pipe Recovery job.

  • Signaling Engineer

    at Siemens

    August 2003 - July 2004

    Bangkok

    Bangkok MRT Underground Train Project - In charge of 3 Signaling main systems; Central Traffic Control, Automatic Train Control, and Interlocking, which are designed to provide safe, punctual, and automatic transportation. - Installed FTGS boxes (rail way train locating system) from BangSue to HuaLamphong stations.

Education

  • Engineering

    at KMIT'L

    1999 - 2003 (4 years) Bangkok

  • Diploma

    at Cudahy High School

    1997 - 1998 (1 year) Wisconsin

Hives