Project Engineer QA/QC having . 9+ years experience in the areas of Fabrication and erection of piping Execution and Inspection of piping, pressure vessel, structural, storage tanks.Having certification in AWS CWI , CSWIP 3.1, ASNT Level II now working as Sr.QC QC Engineer in Sices group Poland

Experience

  • Sr.QA/QC Engineer

    at Sices Group

    September 2014 - at Present

    Województwo Lubelskie

    Responsible to review Project activities (i.e., procedures, inspection plans, work authorizing documents, test plans, as applicable) and ensure that appropriate elements of the Quality Assurance Program (Commitments and Requirements) are met. Coordinates activities with QA/QC Management,and Construction Organization to include Construction Site Manager, Field & Welding Engineering for preparation, review, approval and closure of Documentation Work/Data Packages. Maintains client relationships to assure free communication of information and reasonable resolution of quality problems so that quality goals are attained with minimal rework and repair. Performs surveillance of process implementation and problem investigation/analysis as needed.

  • Sr.Project Engineer Mechanical

    at MottMac Donald Engineering & Consultancy Ltd

    February 2013 - July 2014

    Mumbai - Mahārāshtra

    Preparing BOM & segregating materials according to Isometrics. Preparing test packages for pressure testing. Ensuring mechanical completion of test packages after final box up with permanent gasket and inline instruments as per P&ID Preparation of QC documents like PQR, WPS, and WQT, ITP, etc. Track record in NDT services and technical experience in NDT procedures, demonstrated ability to effectively perform assigned NDT tasks and interpret results of inspections Assign jobs to NDT personnel and coordinate with NDT technicians engaged by Client to carryout NDT on the equipment’s as per inspection Test plan. Arrange resources and utilities Keeping track of NDT requirements as per project specification and ensuring the compliance before giving NDT clearance for test packages Inspection and witnessing of pressure test, water filling test for storage tanks etc Final Dimensions Checking ,Incoming Material Inspection ,

  • Project Engineer QA/QC Site

    at IBI Chematur Engineering & Consultancy Ltd

    September 2011 - January 2013

    Bharūch - Gujarāt

    Preparation of QC documents like PQR, WPS, and WQT, ITP, etc. Track record in NDT services and technical experience in NDT procedures, demonstrated effectively perform assigned NDT tasks and interpret results of inspections coordinating and scheduling NDE inspections proficiently to meet client requirements while ensuring safety, quality and efficiency Assign jobs to NDT personnel and coordinate with NDT technicians engaged by Client to carryout NDT on the equipment’s as per inspection Test plan. Arrange resources and utilities Inspection of fitups, weld visuals and preparation Q/C related documents like fitup and weld visual reports Keeping track of NDT requirements as per project specification and ensuring the compliance before giving NDT clearance for test packages Inspection and witnessing of pressure test, water filling test for storage tanks etc Final Dimensions Checking ,Incoming Material Inspection Blasting and painting Inspection as per project requirement

  • Site Engineer QA/QC

    at Toyo Engineering India Ltd

    April 2008 - August 2011

    Bharūch - Gujarāt

    Inspection of fitups, weld visuals and preparation Q/C related documents like fitup and weld visual reports Keeping track of NDT requirements as per project specification and ensuring the compliance before giving NDT clearance for test packages Inspection and witnessing of pressure test, water filling test for storage tanks etc RA Bill checking & finalization as per monthly progress Preparation of final material reconciliation statements Preparation of QC documents like PQR, WPS, and WQT, ITP, etc. DPT, UT, MPT & Radiographic film interpretation Blasting and painting Inspection as per project requirement Preparing test packages for pressure testing.

  • Site Engineer

    at Bilfinger Neo Struco Construction Ltd

    November 2006 - March 2008

    Jāmnagar - Gujarāt

    Preparing BOM & segregating materials according to Isometrics. Material Take Off Maintaining proper records for site modifications and preparation of as-built drawings Inspection of fitups, weld visuals and preparation Q/C related documents like fitup and weld visual reports Keeping track of NDT requirements as per project specification and ensuring the compliance before giving NDT clearance for test packages Final Dimensions Checking ,Incoming Material Inspection ,

Education

  • C swip3.1 Certified welding Inspector

    at TWI

    2014 - 2016 (2 years) Madhyamanchal

  • Level II RT,UT,MT,PT

    at ASNT

    2008 - 2016 (8 years) Mumbai Suburban - Mahārāshtra

  • Certified Welding Inspector CWI

    at AWS

    2010 - 2015 (5 years)

  • Mechanical Engineering

    at State

    2002 - 2006 (4 years) Nilgiri - Tamil Nādu

Services offered

  • Piping Inspection , welding Inspection , QA/QC

    Project Engineer QA/QC having 10+ year experience in Oil& Gas firm having C SWIP 3.1 AWS CWI , ASNT Level II in PT, UT, MT, RT. and in the areas of piping fabrication and erection Knowledge in ASME Section IX, V , VIII ,ASME B 31.3 , B31.1 D1.1, also knowledge in pressure vessel , heat ex changers, Storage tanks, having knowledge in different type of welding techniques, knowledge in international codes and standards like ASME, API worked with materials like CS, SS, Duplex steel , Inconel ,LTCS, Alloy steel. Ability to expedite the project within stipulated time as per project quality requirements.
    Inspection of welds is a particular form of Visual Inspection which requires knowledge of the welding processes, the potential and reasons for defect formation and methods of rectification. Certification for Welding Inspection has therefore been somewhat separate from other NDT techniques and has been developed by the organisations with prime responsibility for welding rather than the NDT organisations
    Fabrication of pressure vessel , heat exchanger crude column , piping spool , preparing the documents like ITP, QCP , Job Specification , WPS, PQR, WQT, radiography repair specification Incoming materiel Inspection , coronation with NDT Department , preparing NDT as per job specification and Code requirement , radiography film interpretation, execution of repair , carrying out weld visual,dimension painting, preparing final document , coordinate with sub contractors . Updating and keeping project reopens and project schedule checking the sub contractor invoice

Languages

  • English Conversation

  • Hindi Native

  • Gujarati Conversation

  • Malayalam Native

  • Tamil Conversation

Followers (8)

Following (57)

Hives