Experience

  • Sr. Quantity Surveyor

    at Nshama Developer

    February 2019 - at Present

    Dubayy

    Projects: Town Square’s 18,000 Apartments,3,000 Townhouses and including Infrastructure with main Park. The Value of Project: AED 4.5 billion Client: Nshama Developer LLC Project Management: Nshama . Duties & Responsibilities: • Review & Approve the contractor's Payment application. • Prepare economic feasibility studies on changes and adjustments to cost estimates Evaluates variations and handles contractual correspondences. • Compute final account taking into consideration all variations, amount expanded from Provisional Sum • Nominated contractor procurement and management, both at pre-and post-tender stages • Coordinate with cost consultant resolve the Commercial issues. • Preparation of Bill of Quantities using as per the principal method of measurement (POMI, CESMM3 &NRM2) for Tender Documents • Evaluation of Site instructions & Variations • Assist the Sr.CM in the preparation of the Business case,

  • Quantity Surveyor

    at KEO International Consultants, Dubai

    June 2017 - August 2018

    Dubayy

    Project: AKOYA by DAMAC, Cost : AED 300 Million Client : DAMAC Consultant : KEO International Consultants The named after the Akoya pearl is a 28 million-square-foot development of substantial properties where outdoor living comes to life. The project covered the complete Villa Construction, and fully Infrastructure works and Trump International Golf Club. I involved Road works, Street lighting, Portable water, Foul sewer, TSE & Sewerage treatment Plant, Micro tunnel, LV, MV, HV & EHV Electrical Works Substation, Landscape & Artscape

  • Cost Manager

    at Currie & Brown in KSA

    February 2017 - May 2017

    Makkah Province

    Project: King Faisal Medical City Project. Cost : SAR 2.7 Billion Client : KSA Ministry of health Cost Consultant : Currie & Brown The King Faisal Medical City in the southern province (Abha) will have a 1,350-bed capacity. The Prince Mohammed bin Abdulaziz Medical City in the northern province (Al Jouf) will have 1,000 beds. Both medical cities will incorporate housing and other facilities for medical staff in addition to their hospital facilities. Duties & Responsibilities • Prepare master Budget reporting process • Prepare reports base on the design cost estimates and provide updates regularly • Attend the commercial meeting with contractor and client • Benchmarking requirements against similar projects. • Cost allocation and estimation for various project. • Preparation of elemental cost breakdown. • Take off area for BUA/GIA

  • KEO International Consultants in KSA

    at KEO International Consultants in KSA

    June 2015 - October 2016

    Minţaqat al Bāḩah

    Key Projects: King Abdul Aziz Road Development and Infrastructure Cost : AED 6.7 Billion Client : Umm Al Qura Consultants : KEO International Consultants. The project consists of Demolition, substantial earth work, Road construction, interchanges, bridges, underpass, highway structures, retaining wall, parking, Pedestrian Boulevard, landscaping, utilities network, metro Tunnels, and Stations Duties & Responsibilities • Payment mechanism and procedures ensuring that all executed works are measured and claimed immediately at the end of each interim payment period. • Liaises with the contractor’s quantity surveyors in verifying measured quantities and processing payments • Variations analysis as per design change and client requirement • Rate build-up for new Item • Prepare the final account

  • Quantity Surveyor

    at Al Rajhi Construction LLC

    February 2014 - June 2015

    Abū Z̧aby

    Key Projects: The Development of South Samkha Infrastructure - LOT 3 Cost : AED 590 million Client : MUSANADA Consultant : Mott Macdonald’s This Project consists of Infrastructure Development including Earthworks, 80 km of arterial roads and 270 km of internal neighborhood roads & Parking, Sewerage, Storm water, Potable water, Irrigation, Telephone, Electrical and Street lighting works.

  • Project Quantity Surveyor

    at Boom Construction Company

    June 2010 - December 2012

    Al Wakrah

    Key Projects: Project type- Infrastructure (Road, Underpass, Bridge, Utilities, Landscaping & Etc). • Upgrading of Existing Route55 single carriageway connecting Doha to Um Saied (70 million QR) • Doha Express way Infrastructure Road construction (590 million Qatar Riyal) I was assigned to work Road and Infrastructure Project, which covers the elements of Road and Earth works, Road marking and signs, Krebs and tiles, Portable Water, Safety fence and barrier, Electrical, Q-Tel, Street lighting, Traffic signal gantries, Drainage, Sewerage, and Irrigation & Landscaping Works.

  • Quantity Surveyor

    at China Harbour Engineering, Sri Lanka

    May 2008 - December 2009

    Eastern Province

    Projects: TIIP A grade Infrastructure and bridge project Cost :4260 Million LKR Client : Road development Ministry Consultant :: Road development Authority

  • Quantity Surveyor

    at Sierra Construction

    April 2005 - March 2008

    Eastern Province

    Projects: Eastern – Graded water supply project. Cost : 2260 Million LKR Client : National Water Supply & Drainage Board, Sri Lanka Consultant : Q-Serve

Education

  • BSc (Hons) in Quantity Surveying & Construction Management

    at Sheffield Hallam University, UK

    2012 - 2013 (1 year) Western Province

  • BTEC Higher National Diploma in Quantity Surveying

    at ICBT Campus

    2006 - 2008 (2 years) Western Province

  • Diploma in Quantity surveying

    at Eastern technical development institute

    2004 - 2005 (1 year)

Languages

  • Arabic Elementary

  • English Conversation

  • Tamil Native

Hives