Experience

  • Electrical Engineer

    at Royalhaskoning

    April 2018 - May 2018

    Provincie Gelderland

    Senior Engineer for Basic & Conceptual Design and Design Review of DATA Center for Stockholm & Copenhagen. April 2018- Jun 2018 Preparing report and evaluation of existing network and preparing new design for new data Preparation Risk Analysis table for Stockholm & Copenhagen Data Center distribution network

  • Electrical Lead Engineer

    at EIED

    April 2015 - February 2018

    Ostān-e Tehrān

    EIED &TOYO are joint to develop Basic design, meanwhile TOYO has prepared process document (except common process & utility). 1- Preparing Document list for Basic design. 2- Preparing Motor List form Process data sheet. 3- Preparing Overall cable route and overall earthing layout. 4- Preparation of Network Study & Cable sizing and Earthing calculation (with ETAP software). 5- Preparing individual Single Line Diagrams and Overall Single line diagram. 6- Preparing substation equipment plan layout. 7- Preparing Load shedding table. 8- Preparing Emergency Electrical Loads Study document. 9- Preparing MTO for Main Equipment’s. 10- Preparing MTO for Bulk Material

  • Electrical Lead Engineer

    at EIED

    May 2007 - March 2015

    Ostān-e Tehrān

    May 2007- March 2015 1- Reviewed and commented on Front End Engineering Design (FEED) electrical designs prepared by the engineering consultants (Worley Parsons) and Prepared electrical specification of project. 2-  Supervised Electrical designs and development of projects including Network Analysis, relay coordination systems, underground cable trench layout drawings. 3- Prepared underground Cable trench drawings while evaluating the best alignment to avoid design conflict with existing underground utilities. 4- Preparing Tender documents and evaluate Vendor Proposal. 5- Prepared specifications, and coordinated activities with clients, contractors, and different vendors. 6- Reviewed all calculations and designs prior to submission to client. 7- Performed calculation network for refinery and preparing dynamic simulation of Motor starting for largest Electrical Motor (Motor rated is 5200 kW).

Education

  • MS in Electrical Engineering

    at KNT University

    1996 - 1998 (2 years) Ostān-e Tehrān

  • BS in Electrical Engineering

    at Sharif University of Technology

    1990 - 1995 (5 years)

Languages

  • English Negotiation

Hives