  • Mechanical Completion Leader

    at SAIPEM TURKEY – IZMIR

    March 2018 - December 2018

    İzmir

    SOCAR TURCAS AEGEAN REFINERY PROJECT for 4.2 BIL. USD • in charge of mechanical pre-commissioning and commissioning scope within 105 sub-systems in Hydro-cracker Unit. • reviewed and coordinated 8000 no's of punch items with Engineering, Construction Commissioning to get them closed. • collected relevant data to enable a compilation of 2000 no's of certification packs as per handover management procedure. • issued as-built isometrics, reviewing PIDs, managing lack of material with warehouse to mitigate piping problems affecting handover system. • reported status of mechanical completion to superior management and subcontractor.

  • Civil Supervisor

    at SAIPEM TURKEY – IZMIR

    August 2015 - March 2018

    İzmir

    SOCAR TURCAS AEGEAN REFINERY PROJECT for 4.2 BIL. USD • validated Civil, Earthworks, Piling and U/G works done by others according to drawing data, specification and codes for structures in progress or at compliance in Hydrocracker, HGU, DHU, SGU Units (about 66000m³). •coordinated infrastructures within the drainage system, E&I system and U/G system to prevent possible interferences in battery limit of a unit. • verified applicability of drawings with their attachments and hold points and address these to Eng. Dept. • used to support the construction manager with weekly & monthly progress and work front reports related to Insulation & Fireproof and Civil on a regular basis. • able to issue site instructions for the execution of site works to prevent any delay of progress when required. • executed risk assessment and prepared job packages for civil disciplines prior to heavy lifting operations until 1300 tones.

Languages

  • English Native

Hives