Experience

  • Project and Maintenance Engineer Intern

    at Ford Otosan Yeniköy Factory

    February 2019 - September 2019

    Kocaeli

    I made my project. It was for worker. I improved working conditions. Also I worked with maintenance team but factory rules were bad I think. The rules said that the intern can't make anything, only they can watch and they can say their idea. We didn't enter robot area, we didn't use robot, we didn't fix anything. But I requested work from my supervisor. He said me the laser measuring system is making a lot of faults and we don't have engineer for this line. I worked this line. There was 2 TV in measuring system for results of the measurement and these TV were broken. I search the fault. I found that there was electric surge. The TV broken for this fault. I bought an uninterruptible power supply. I thought that this appliance can protect the TV and it protected. The laser system's measuring circuit made a fault. It didn't work. I fixed this fault. When I left the factory there wasn't any fault in this system. I made presentation my project to my supervisors and my internship finished.

  • Maintenance Intern

    at PepsiCo

    August 2018 - September 2018

    Kocaeli

    We repaired a lot of faults with my craftsman. I usually worked for mechanical faults. I learned a lot of information. I think that this internship is my best. I learned a lot of information about PepsiCo Suadiye Factory.

  • Project Control and Production Engineer Intern

    at Robo Automation

    June 2017 - July 2017

    Kocaeli

    We made fixture for Ford Otosan İnönü Factory. There is a lot of pistons, sensors, valves... This parts working together, the master is PLC for fixture, other parts are slave. Fixture fixes the parst and robots process parts.

  • Manufacture Intern

    at Robo Automation

    June 2016 - July 2016

    Kocaeli

    We made robot line for Ford Courier engine compartment. When I was intern in Robo Automation in 2016 this project made but I only made fixture and electrical panel for this robot line. I didn't know robot programming but I know now. If I had known robot programming, I would have made it.

  • Apprentice

    at Genesis Automation

    June 2014 - August 2014

    Kocaeli

    Learning electrical panel parts, Learning to read project, Making electrical panel installation and controls

  • Intern

    at PepsiCo

    September 2012 - June 2013

    Kocaeli

    Repair of electrical faults, Learning PLC programming, Repair of defective equipment, etc.

Education

  • English

    at Easy Speak Language School

    2018 - at Present (2 years) Kocaeli

  • Mechatronic Engineering

    at Sakarya University

    2014 - 2019 (5 years) Sakarya

  • Electrical and Electronics

    at Karamürsel 100. Yıl Teknik ve Endüstri Meslek Lisesi

    2009 - 2013 (4 years) Kocaeli

Languages

  • English Conversation

Hives