Experience

  • Responsible contractor and supervising mechanical engineer

    at Shanghai Electric Group Europe

    April 2019 - at Present

    Central Serbia

    Building up the new CCPP 180 MW in Pancevo - Serbia

  • Construction Manager

    at ZK Termochem sro Prague - Czech Republic

    June 2010 - April 2019

    Hlavní město Praha

    - Installation of turbine pipelines – Project BIO4 - Copenhagen - Denmark Jun 2018. – February 2019 - Build-up of ESP-s ( Electrostatic Precipitators) for new units No.5 and No.6 ( 2x900 MW ) - Opole Power Station Poland 2016.-2018. - Build up of reservoirs, installation of pipelines and mechanical equipment of new wastewater treatment facilities - Power Plan TENT A - Obrenovac - Build-up of new Pulse Jet Fabric Filters on 4 Units of Power Plant - Pardubice - Installation of LUBECO SYSTEM (Ducts, heating surfaces and pipelines)-Power Plant - TEŠ, Slovenia; 2013-2014. - Reconstruction and modernization of electrostatic precipitator (ESP) of Power Plant TENT B-Obrenovac Serbia 2012. - Installation of technological pipelines to the plant paint shops-FIAT Kragujevac, Serbia 2011-2012. - Replacement of tube panels on the lower radiation part of boiler 210 MW-power plant Kostolac,Serbia 2011. - Repair of pipeline suspension system Power Plant TEKO B, Serbia 2010.

  • Senior site engineer

    at CPI (Process Engineering Center)

    February 2008 - December 2009

    Leningradskaya Oblast’

    - Technical supervision and coordination of the installation of steel structures and piping, Kiriši, Russia 2009. - Technical supervision and coordination between subcontractor and the suppliers (Technic KTI-Rome , HEURTY PETROCHEM-Paris, LHT Lummus) on the installation of heaters of Hydrocracker Complex (Vacuum Distillation, Visbreaking, Hydrocracking, Hydrogen facilities), Russia 2008.

  • Mechanical engineer/Construction manager/Site manager

    at Termoelektro A.D Belgrade

    June 2002 - February 2008

    Central Serbia

    - Repair works on pipelines of the boiler block E on power plant “Niederaussem –RWE” - Repairs fan (fresh air, flue gas and cold flue gases) to both block of power plant “Kostolac B” - Reconstruction of the pipeline of the regulation system for hydro units A9 and A 10 to the hydroelectric plant “Djerdap 2” Serbia - Managing a team of engineers on the making “Project of installation works for the revitalization of hydroelectric plant “Iron Gate” in cooperation with specialists the Russian company Siloviji Machines”, - Modification of the output edges of the stator pillars of hydro units A4, A5, A6 and A1 of hydroelectric plant “Iron Gate”,Hydroelectric plant“Djerdap 1”, Serbia - Revitalization of special mounting devices for the revitalization of hydroelectric plant “Iron Gate” - Planning, organizing and execution repairs of control gate to the hydroelectric plant “Djerdap 2” “Djerdap 2”, Serbia

Education

  • • 432 - Responsible Contractor for mechanical installation of water supply facilities and industrial water, hydraulic engineering and hydro power

    at Serbian Chamber of Engineers

    2016 - 2016 (1 year)

  • • 333 - - Responsible Design Engineer means of transport, storage and mechanical construction and technology

    at Serbian Chamber of Engineers

    2016 - 2016 (1 year)

  • • 434 – Responsible Contractor means of transport, storage and mechanical construction and technology

    at Serbian Chamber of Engineers

    2015 - 2015 (1 year) Central Serbia

  • • 430 – Responsible Contractor of thermodynamics, thermal energy, gas and process technique

    at Serbian Chamber of Engineers

    2012 - 2012 (1 year)

  • • Master of Science in Mechanical Engineering (MSME)

    at University of Nis, Faculty Of Mechanical Engineering, department of constructions and mechanization

    1992 - 2000 (8 years)

Languages

  • English Native

  • Russian Negotiation

  • German Elementary

Hives