Experience

  • THE ENGINEER MEP

    at INFRASTRUCTURE DEVELOPMENT AUTHORITY PUNJAB

    May 2017 - at Present

    Punjab

    Construction of New 132 KV S/S & with supervise all the MEP works for Pakistan Kidney and liver Institute & Research Center (Including Energy Center of Hospital)-Asia Biggest Hospital 800 Beds including Ro plants installation for dialysis patients Duties and Responsibilities: • Provide an Engineering coordination and management function for the Project. • Keep the project on schedule by assisting the project team and taking corrective actions as and when required. Control of the accomplishments of the project milestones and report the same. • Responsible for all power & MEP works. APPRECIATION CERTIFICATES • Received appreciation/Outstanding performance certificate from CM-punjab • Received Commendation Certificate from CEO (Infrastructure Development Authority) For Outstanding Performance” • Received Appreciation certificate as The Engineer MEP from Vice President of South Korean Firm (MOOYOUNG CM) Working as Project Management Consultant on Same Project

  • SENIOR PROJECT ENGINEER

    at ALFANAR CONSTRUCTION

    November 2015 - April 2017

    Minţaqat ar Riyāḑ

    Duties and Responsibilities: • Provide an Engineering coordination and management function for the Project. • EHV Substation construction supervision conforming to IFC Drawings, construction procedures, SEC standards, NEC & NEMA Standards. • Keep the project on schedule by assisting the project team and taking corrective actions as and when required. Control of the accomplishments of the project milestones and report the same • Monitoring the installation and testing of Outdoor 380kV Hybrid GIS module, Freestanding CT’s, CVT’s, Surge arresters, Post Insulators, DS/ES, Gantry, Equipment Structures, Aluminum Bus bars, Grounding system, shielding system, . 380/115/13.8 KV BSP GIS bay installation responsible.

  • SENIOR PROJECT ENGINEER

    at SYNERGY EPC

    January 2014 - October 2015

    Sindh

    Duties and Responsibilities: • Applying QMS for MV and LV motor refurbishment. • Responsible for equipment installation and continue energizing of electrical equipment to pre-commissioning and commissioning. • Field control station and Field control panel refurbishment and installation. • Coordinating with area teams for Lighting, Earthing, conduit and power cable laying. • Substation MCC’s refurbishment and functional testing. (415V, 3.3KV and 11KV) • Protection system testing of 415V, 3.3KV and 11KV. • ENI PAKISTAN JOB: REPLACEMENT OF MV MOTOR AT BHIT FIELD • ENGRO FERTILIZER GT-604 24-MW Pre FILTERATION DESIGN PROJECT • RO PLANT INSTALLATION CAPACITY 5000 GPD AT PARCO FAZIL-PUR

  • ELECTRICAL ENGINEER

    at BYCO PETROLEUM- ORC-2 REFINERY

    January 2012 - December 2013

    Sindh

    • Ensure smooth functioning of the various electrical systems, network such as transformers, transmission systems, substations etc. • Monitors the operation of 11KV, 3.3KW and 415 volt switch gear, transformers, motor control centers, steam and diesel engine generators, uninterrupted power supply (UPS) and DC power supply system in the Plant and BCT area. • Workers on shifts to ensure the safe operation of all electrical equipment and that power is available for critical Plant equipment and emergency generators, if imported power fails. Also carries out routine preventive and breakdown maintenance of electrical equipments as required. • Having good experience in all kinds of erection works related to electrical and instrumentation such as HV/MV, LV, GIS, Power & Distribution Transformers,11KV / 6.6KV / 415V switch gears Power Distribution Boards and PLC / DCS Panels, MOV’s, HT/LT Motors & Local Instruments.

Education

  • QA/QC APPROVAL

    at SEC

    2017 - 2017 (1 year) Minţaqat ar Riyāḑ

  • HIGH VOLTAGE APPROVALS

    at SAUDI ELECTRICITY COMPANY

    2016 - 2016 (1 year) Minţaqat ar Riyāḑ

  • EMBA (PROJECT MANAGEMENT

    at NIMS

    2014 - 2015 (1 year) Punjab

  • BE-ELECTRICAL ENGINEER

    at HUET

    2008 - 2012 (4 years) Sindh

Services offered

  • SENIOR PROJECT ENGINEER

    Career Profile:
    • Well experienced in Construction Management as working in 380/115/13.8 kV Bulk Supply Point Gas Insulated Substation Construction Management as a Project Engineer.
    • Experience in Procurement, Installation & Pre-commissioning of Gas Insulated Switchgear, HV Transformers, Shunt Reactor, Over headline, Relay Panels, Control & Metering Panels, LV switchgear, Dry type transformer, low voltage panel boards, HV & LV cables, DC system (48V &125V), Grounding, Steel Structures, HVAC system, Telecommunication , Fire detection & Fire fighting System
    • Well knowledge in Project Quality Control, Quality procedures & Typical Inspection & test Plan
    • Well experienced in QA/QC activities & Procurement quality activities, Approved from Saudi Electricity Company
    • Strong, coordinating, planning and problem solving abilities in project teams.
    • Installation and commissioning of 11 KVA, 6.6 KVA, 415 V MCC’s, UPS, Battery chargers, battery bank, etc. and also familiar with Earthling system and street lighting system, CCTV Cameras.
    • Cable Laying, Testing & commissioning of HV, MV, LV Power cables, Control & Instrument cables.
    • Want to lead the team as well as a good member of the project team.
    • Ability to work under pressure, in time-sensitive, fast-paced environments.
    • Uncanny ability to handle projects from planning through to execution.
    • Creative with effective interpersonal skills and organizational abilities.
    • High Voltage Live approval from Saudi electricity company

    Projects:

    • Construction of New 132 KV S/S & supervise all the MEP work for Pakistan Kidney and liver Institute & Research Center (Including Energy Center of Hospital)-Asia Biggest Hospital 900 Beds
    • 250 RO Plant installation in all over Punjab currently working at desalination plant of ukara for power generation.
    • Construction of New Al-Uqair 380/115/13.8 KV BSP & Expansion of Jawatha 380 KV/115 KV EHVPD Saudi Electricity Company
    • BYCO PETROLEUM PAKISTAN (OIL REFINERY COMPLEX-II 60000 BPD)
    • ENI PAKISTAN (REPLACEMT OF 6.2 MV MOTOR AT BHIT FIELD SEHWAN)
    • ENGRO FERTILIZER (GT-604 24-MW Pre FILTERATION DESIGN PROJECT)
    • RO PLANT (INSTALLATION CAPACITY 5000 GPD AT PARCO FAZIL-PUR)

    Post: The Engineer (MEP) (1st May 2017 To present)
    Construction of New 132 KV S/S & with supervise all the MEP works for Pakistan Kidney and liver Institute & Research Center (Including Energy Center of Hospital)-Asia Biggest Hospital 800 Beds including Ro plants installation for dialysis patients
    Duties and Responsibilities:
    • Provide an Engineering coordination and management function for the Project.
    • Keep the project on schedule by assisting the project team and taking corrective actions as and when required. Control of the accomplishments of the project milestones and report the same.
    • Drive and facilitate an effective involvement of plant personnel in the maintenance and development of the Quality Assurance System.
    • Management of the Production Team to ensure maintenance is coordinated with production by:
    Initiating and implementing all first level preventative maintenance programs involving the operations team as required
    • Reporting of all equipment faults / failures to the General Manager.
    • Ensuring agreed spare parts are controlled and available when required.
    • Ensuring raw material availability.
    • Respond to Plant needs after hours, seven days a week and to reside within close proximity to the plant.
    • Provide Technical advice to the Plant Manager and Maintenance Manager as required.
    • Ensure that all activities are performed under optimal health and safety conditions.
    • Responsible for all power & MEP works.
    APPRECIATION CERTIFICATES
    • Received appreciation/Outstanding performance certificate from CM-punjab
    • Received Commendation Certificate from CEO (Infrastructure Development Authority) For Outstanding Performance”
    • Received Appreciation certificate as The Engineer MEP from Vice President of South Korean Firm (MOOYOUNG CM) Working as Project Management Consultant on Same Project”

    Client: Saudi Electricity Company

    Contractor: ALFANAR
    Project: Al-Uqair 380/115/13.8 KV BSP
    The Project scope includes mainly two Parts, construction of new Al-Uqair 380/115/13.8 kV BSP and Expansion of Jawatha 230 kV SS including additional works involving new installation/modification at associated substation, Expansion work Involves the construction of indoor substation consisting of 6 Bays and Construction of a new Control Building.

    Duties and Responsibilities:
    • Provide an Engineering coordination and management function for the Project.
    • EHV Substation construction supervision conforming to IFC Drawings, construction procedures, SEC standards, NEC & NEMA Standards.
    • Keep the project on schedule by assisting the project team and taking corrective actions as and when required. Control of the accomplishments of the project milestones and report the same
    • Coordinate and conduct meetings to discuss project progress and project problem resolution, both internally and externally, and prepare minutes of meetings. Follow up on the actions detailed in the meeting
    • Monitoring the installation and testing of Outdoor 380kV Hybrid GIS module, Freestanding CT’s, CVT’s, Surge arresters, Post Insulators, DS/ES, Gantry, Equipment Structures, Aluminum Bus bars, Grounding system, shielding system
    • Complete installation, testing of Mechanical systems, like HVAC system, DDC, Fire Alarm & Fire fighting System (FM-200).
    • Coordination of inspection activities on site. Ensuring quality and safety on site in accordance with the approved Quality Management Plan and Safety & Loss Prevention Plan.
    • Inspecting and certifying work execution. Issuing Site Instructions for non compliances. Checking reports of inspection done daily and monitoring the Log Book.
    • Incoming materials Inspection with respect to approved Specification, Data sheets, Material Approval ,shipment release certificate and quality plan.
    • Substation construction material and design submittal review.
    • Working knowledge of Civil Activities related to construction of Control Building, EHV Outdoor Equipment Foundation Structures, EHV Gantry and Tower Foundations, Manholes, Duct banks, Excavation & Backfilling works.
    • Attend internal project meetings to track the project progress with respect to the project schedule and understand the problems with project execution.
    • Ability to finalize material requirement from SOW and IFC drawings
    Job: Senior Project Engineer (Jan 2014 to October 2015)
    • ENI PAKISTAN JOB: REPLACEMENT OF MV MOTOR AT BHIT FIELD
    • ENGRO FERTILIZER GT-604 24-MW Pre FILTERATION DESIGN PROJECT
    • RO PLANT INSTALLATION CAPACITY 5000 GPD AT PARCO FAZIL-PUR
    Duties and Responsibilities:
    • Applying QMS for MV and LV motor refurbishment.
    • Responsible for equipment installation and continue energizing of electrical equipment to pre-commissioning and commissioning.
    • Field control station and Field control panel refurbishment and installation.
    • Coordinating with area teams for Lighting, Earthing, conduit and power cable laying.
    • Substation MCC’s refurbishment and functional testing. (415V, 3.3KV and 11KV)
    • Protection system testing of 415V, 3.3KV and 11KV.
    • BYCO PETROLEUM PAKISTAN

    Byco petroleum Pakistan is one of the biggest crude oil refinery, has a capacity of 115K BPD. This project covers the construction, refurbishment, calibration, installation, replacement and pre-commissioning of instrumentation and control.

    Job: Project Electrical Engineer(1st Feb 2012 to Dec 2013)


    Duties and Responsibilities:
    • Ensure smooth functioning of the various electrical systems, network such as transformers, transmission systems, substations etc.
    • Monitors the operation of 11KV, 3.3KW and 415 volt switch gear, transformers, motor control centers, steam and diesel engine generators, uninterrupted power supply (UPS) and DC power supply system in the Plant and BCT area.
    • Workers on shifts to ensure the safe operation of all electrical equipment and that power is available for critical Plant equipment and emergency generators, if imported power fails. Also carries out routine preventive and breakdown maintenance of electrical equipments as required.
    • Having good experience in all kinds of erection works related to electrical and instrumentation such as HV/MV, LV, GIS, Power & Distribution Transformers,11KV / 6.6KV / 415V switch gears Power Distribution Boards and PLC / DCS Panels, MOV’s, HT/LT Motors & Local Instruments.
    • Cable Laying, Testing & commissioning of HV/MV, LV Power cables, Control & Instrument cables.
    • Installation and commissioning of 11KVA/ 6.6KVA/ 415V MCC’s, UPS, Battery chargers, battery bank, etc. and also familiar with Earthling system and street lighting system.
    • Testing & commissioning of HV/MV, LV Power cables, Control & Instrument cables.
    • Commissioning and Maintenance of EOT cranes up to 60 tons
    • Erection, Commissioning and Maintenance of HT/LT motors
    • Erection and commissioning of lightning arresters, Aircraft warning light etc.
    • Erection, testing, commissioning of Industrial, domestic and street lighting system.
    • Installation, testing and commissioning of all kinds of UPS systems.(single and parallel)
    • Installation and commissioning of all types of batteries.
    • Responsible to undertake operations, troubleshooting and maintenance of the electric systems
    • Undertake immediate repair works for system defects, errors or malfunctioning
    • Maintain log books and prepare weekly/monthly reports to compute statistics for power distribution and submit the same to senior
    • Strong in Project Execution, Project Management, Project Scheduling and Cost Control.
    • During pre-construction and construction stages, developing a detailed work schedule and manpower planning.
    • Executing and Monitoring Electrical construction activities to meet targeted deadline.
    • Ensuring that contractors comply with all aspects of the Worksite HSE Plan and policies, site regulations, permit to work and Client requirements.
    • Implementing the project HSE plan and company HSE policy during the course of the project to achieve “ZERO” Loss Time Injury.
    • Educating all the employees on basic site HSE Rules & Regulations.
    • Facilitate in the implementation of the project HSE plan.
    • Implement strictly the use of personal protective equipment (P.P.E) while working or performing their job at the site area.
    • Responsible for Customer/Consultant /Contractor/Subcontractor co-ordination.
    • Ensuring that all the Test Report/Protocols prepared in time and Signed Off from the client for Installation, Cold Loop Checking and Hot Loop checking and commissioning activities.
    • Closely working with all leading vendor teams starting from erection, commissioning till system handing over.
    • Co-ordination with internal Engineering Department, Civil Department, Mechanical, Instrumentation and Pre-commissioning department to resolve problems arising during construction stages.
    • Responsible for monthly site measurement certification from customer.
    • Responsible for subcontractor measurement certification.

Languages

  • English Native

  • Arabic Conversation

Hives