Experience

  • Principal Petroleum Engineer

    at Telesto Energy

    August 2019 - at Present

    Kuala Lumpur

    FDP delivery, Production optimisation, well completion

  • Specialist Production Technology

    at Petronas Carigali Sdn Bhd

    July 2012 - July 2019

    Kuala Lumpur

    Accomplishments: • Equipped the junior staff with required skills and methodologies through provision of mentorship, coaching, and professional development opportunities. • Played a key role of sub-surface lead and improved well completion by 20%. • Optimised cost of workover and well intervention and completion by 30% . • Guided multi-functional teams and improved overall organisational performance by providing leadership in boosting culture change • Achieved production increment by 40MMSCFD through tubing installation of ceramic screen operations. • Increased gas production by 60 MMSCFD from KASS field via conduction of subsea HIPPS debottleneck study. • Increased gas production by 40 MMSCFD via PWTS upgrading. • Restored 150 MMSCFD by resoling well integrity problem from two wells. • Delivered 7 numbers of FDP, FFR and IADP project • Secured high risk gas wells by preparing and implementing abandonment well proposal.

  • Petroleum Engineer

    at Kuwait Oil company

    December 2007 - July 2012

    Muḩāfaz̧at al Aḩmadī

    Key Accomplishments: • Prepared and delivered over 30 low cost vertical, horizontal, and intelligent wells. • Managed water production from horizontal wells and boosted reserve recovery through completion of well openhole with Swell packer and ICD/ICDs. • Gained 2500 BOPD from horizontal wells with CTU by accomplishing challenging water shut-off task. • Completed state of the art design of high-pressure asphalting prone deep wells with the inclusion of capillary tube for consistent injection of asphaltene inhibitor. • Directed the team to increase asset value through reactivation of idle wells through acid fracture and matrix acidisation stimulation, resulting in acquiring 6000 BOPD. • Optimised CAPEX and OPEX via conduction of challenge session regularly with supplier and service provider. . Selected appropriate person for artificial lift, developed ESP pump design, and supervising troubleshooting. * Improved field production and water injection and WRFM surveillance

  • Executive Engineer Production

    at Oil and natural gas corporation limited , India

    May 2002 - December 2007

    Mumbai - Mahārāshtra

    • Successfully completed 15 high profile project work related to production enhancement, well stimulation, sand control, well integrity and well completion design. • Conduct audit of well completion of all completion of MH Asset prior to execution. • Design of HPHT completion for a deep Gas reservoir containing H2S and high CO2 for an offshore field in line with Company QHSE policy. • Successful completion design of KGD6 and KGD 5 deepwater wells of KG basin. • Support FDP study of HTHP Hydro fracturing of gas reservoir of western filed of India. • Provided 30+ batches of IADC accredited “WellCap” Supervisory & Drillers level.

  • Assistant Executive Engineer

    at Oil and Natural Gas corporation limited

    February 1993 - May 2002

    Jorhat - Assam

    • As Petroleum Engineer responsible for technical and quality assurance in workover, completion, well surveillance and well intervention services. • Responsible for review and manage all the well stock, review NFA and closed-in strings. • Execution of workover and well intervention job as workover supervisor comply with company regulation and HSE guidelines. Key Achievements- • Awarded with best performer as a workover operation engineer consecutive 5 years. • 9 years of workover rig operation: Worked over more than 70+ wells – main job performed fishing, artificial lift installation, water shutoff, casing repair, secondary/ remedial cementation, zone change, and perforation, abandonment and sand control. • GL well optimization through network modelling and troubleshooting • Awarded with the best Fishing Engineer from Director.

Education

  • B-Tech Mechanical

    at NERIST

    1989 - 1993 (4 years) Bhandara - Mahārāshtra

Hives