Self-motivated, results-oriented and calculated risk taker professional, to further developed and improved myself personally and pursue my career. Hardworking, determined, adaptable and a quick learner.

Experience

  • Entrepreneur/Proprietor/Manager

    at JVGZ Taxi and VictorJen Transport Services (02 April 2014 to Present)

    October 2017 - at Present

    National Capital Region

    Achievements: • Passed the Registered Electrical Engineer (REE) Licensure Examination held last 31 Aug. and 01 Sept. 2019. • Able to attend the REE Review Program (250 hours) every weekend, from 27 April 2019 to 29 August 2019, in preparation for the REE Licensure Examination conducted by Professional Regulation Commission (PRC). • Passed the Registered Master Electrician (RME) Licensure Examination held last 17 April 2019. • Able to attend the RME Review and Training Program (150 hours) every weekend, from 13 January 2019 to 15 April 2019, in preparation for the RME Licensure Examination conducted by Professional Regulation Commission (PRC). • Sustainable income for my family and supports my financial needs during my review and while I am preparing to pursue my career. • Spend more time with family especially after 12 years working overseas. • Manage the daily operation, preventive maintenance, repair of units, including driving units without available drivers.

  • Electrical Project Engineer

    at Danway Electrical and Mechanical Engineering LLC

    July 2012 - September 2017

    Dubayy

    Achievements: • Received a Certificate of Appreciation from the client M/s Samsung Eng’g, during the course of the CBDC Project. “In recognition to our team outstanding contribution to safety and for the successful achievement during the 100 days Extensive Working Period. • Bested all other Contractors, Subcontractors and other teams within the company, garnering the First-Place award for crew and individual category for the above event. • Reduced project wastage by 30% in all aspects (5Ms), thus increasing production efficiency by 40%. • Revenue forecast is 100% achieved and positive cash flow always maintained, thru on-time completion of phase of work and costumer satisfied acceptance. • Projects handled were all completed in-line with scope, schedule, cost, quality and safety. • Established own company JVGZ Taxi and VictorJen Transport Services (02 April 2014 to Present).

  • HSE Engineer

    at G. S. E & C

    July 2011 - January 2012

    Abū Z̧aby

    • Promote a positive HSE working culture, providing support to the project by integrating HSE to Quality and Production, creating a Healthy, Safe and Environment friendly activity, and thus attaining more output with better quality. • Communicate and implement Company HSE Policy and Project HSE Manual to every element of the Project team • Prepare, update, check and ensure all activities have approved Risk Assessment and Job Hazard Analysis communicated, accepted and signed by every personnel involved, before any activity can start. • Conduct Site inspections on different areas to check and ensure that the planned, approved and agreed HSE work methods are being carried out. Boast morale to the work force and support team members. • Liaises with Client representative, Company Project Management, Department Heads, Area Heads/Supervisors and other concerned authorities on Project HSE related matters.

  • HSE Enginer (HSE Project Team Leader)

    at Six Construct LLC (BESIX Group)

    September 2007 - September 2010

    Dubayy

    • Head of Department (Health, Safety and Environmental) • Promote a positive HSE working culture, providing support to the project by integrating HSE to Quality and Production, creating a Healthy, Safe and Environment friendly activity, and thus attaining more output with better quality. • Check and update the Company Project HSE Manual conforming to the highest standards available. • Communicate and implement Company HSE Policy and Project HSE Manual to every element of the Project team • Prepare, update, check and ensure all activities have approved Risk Assessment and Job Hazard Analysis communicated, accepted and signed by every personnel involved, before any activity can start. • Plan, prioritize (manpower, resources and challenges), organize, and direct the HSE Department by giving update, coaching and daily briefings to all team members.

  • Senior Infrastructure Technician (Railways)

    at D. M. Consunji, Inc./ First Engineering Ltd.

    November 2005 - February 2007

    Manchester

    • As part of the group, conducts inspection and light maintenance to assigned Train Depots including greasing of points, tightening of bolts, replacing keys, etc. • Conducts assessment of Permanent Way Infrastructure to be safe and sound for Train movement including taking of technical data such as gaps for fish plated joint, switch blade, crossing nose, flange way gap, vertical and horizontal alignment, twist, cants, etc. • Carry out track renewals on depots and mainlines, including re-railing, repairing wet beds, changing wood sleeper and timbers, replacing chairs and base plates, replacing part or whole of switch and crossing, re-ballasting, correcting gauge, eliminating twist, etc. • Trained and examined by First Engineering in Personal Track Safety and Permanent Way Course applicable to UK Railway Infrastructure and assessed as competent Permanent Way Senior Infrastructure Technician.

  • Safety Officer (cum Electrical Engineer/CAD

    at D. M. Consunji, Inc.

    September 1996 - October 2005

    National Capital Region

    • Responsible in the design and submittal of the temporary electrical facilities for the site offices. • Responsible for the design, submittals and installation of electrical lightings for the two bridge projects including connecting roads on both sides. • Drafted and completed the as-built plans of the completed cable trough for signaling systems at train depot, including handing-over. • Supervised the Project Support Group personnel composed of Heavy and Light Equipment Operators. • Responsible in the maintenance, troubleshooting and repair of equipment’s such as generators, service vehicles, water pumps and other electrical and/or mechanical equipment’s in the project. Including temporary facilities and services. • Experienced includes construction and installation of plane line, curve tracks, switches and crossings, safety responsibilities, design, submittals, maintenance and track renewals.

Education

  • Registered Master Electrician Review and Training Program

    at Marinay’s Power House Team Review and Training Center

    2019 - 2019 (1 year) National Capital Region

  • Registered Electrical Engineer Review Program

    at Marinay’s Power House Team Review and Training Center

    2019 - 2019 (1 year) National Capital Region

  • Professional Project Management Program

    at Cambridge Education

    2016 - 2016 (1 year) Dubayy

  • Comprehensive Computer-Aided Drafting and Design (using AutoCAD)

    at Crescent Technologies Institute

    2012 - 2012 (1 year) National Capital Region

  • Computer-Aided Cost Estimating for Building Construction

    at Crescent Technologies Institute

    2012 - 2012 (1 year) National Capital Region

  • Bachelor of Science in Electrical Engineering

    at Bicol University

    1989 - 1996 (7 years) Bicol

Services offered

  • Electrical Engineer

    Construction Site Management (Electrical), Electrical Project Engineering, Electrical Engineering, Railway Infrastructure Engineering

Languages

  • Tagalog Native

  • English Negotiation

Hives