Experience

  • Sr. HSE Engineer

    at Al Ryum Group of Companies

    December 2012 - at Present

    Abū Z̧aby

    Operating under the Al Ryum banner in Abu Dhabi and ARCO in Dubai, the group of companies is comprised of numerous well-coordinated departments as one specializing in the Engineering, Procurement, Construction, Maintenance and Operation of Infrastructure, Civil, Electrical, Mechanical, HVAC, Buildings and Landscaping works. Project assigned :- Adnoc Ruwais Project – Ruwais, Abu Dhbai – UAE Client – ADNOC, PMC – Dorsch Grouppe Warner Bros. Yas Theme Park – Yas Island Abu Dhabi, UAE. Client - Miral , PM – Louis Berger & Consultant – AECOM Dubai Parks & Resorts - Dubai, UAE. Client – Meraas Developers, PM – Sansung & Hill International Yas Island VVIP Road construction & maintenance Client – Abu Dhabi Municipality; Consultant - Parsons

  • HSE Officer

    at Carrara Mid Est Ind Co. LLC

    September 2008 - November 2012

    Dubayy

    Carrara Mid-East Industrial Co. LLC operates since 1977 in the natural stone industry, covering the entire trade and production cycle: from the import of slabs to the manufacturing process and creation of finished works for any size project including engineering support, laying and installation. Project assigned :- Burj Kahlifa – The Burj Khalifa, known as the Burj Dubai before its inauguration, is a mega tall skyscraper in Dubai, United Arab Emirates. It has 828 meters height with 163 stories. PPM Conrad Hotel – Dubai – It is 65 stories building and we were subcontractor on that project.

Education

  • NEBOSH Diploma in Occupational Health & safety

    at NEBOSH

    2013 - 2015 (2 years) Dubayy

  • NEBOSH - International General Certificate

    at NEBOSH

    2010 - 2011 (1 year) Dubayy

  • Diploma in industrial safety

    at IIST

    2005 - 2006 (1 year) Ernākulam - Kerala

  • Diploma in Mechanical Engineering

    at IIMT

    2000 - 2003 (3 years) Ernākulam - Kerala

  • Bachelor Degree of Commerce

    at Mahatma Gandhi University

    1995 - 1997 (2 years) Ernākulam - Kerala

Services offered

  • HSE Engineer

    Preparing Construction Phase Safety Plan and ensuring plan is being implemented, monitored and reviewed.
    Formulating and implementing the HSE training plan for all hazardous activities in the region in consultation with top management for organizational development
    Guiding the site management staff and employees to control hazards, implementing control and work in compliance with client standards
    Monitoring safety officer's regular inspection of sites and work places to determine whether work is being carried out in accordance with Company Policy, Method Statement’s and the relevant statutory provisions.
    Provide an Inspection Report to site management and send a copy of the report to the General Manager, Area Manager.
    Identifying potential hazards on new contracts before the commencement of work, proposing the safety organization and emergency precautions required.
    Planning schedules of company sites, sub-contractor operated sites towards enhancing the HSE standards and improve the safety measures in business operations Record and analyze of information on injuries, damage and production loss, assess accident trends and review overall safety performances.
    The preparation of safety and health requirements, compiling the project safety manual and all related procedures.
    Ensuring all United Arab Emirates Government regulations concerning safety and health are implemented in the execution of the project.
    Ensuring that all safety equipment and personal protective clothing used on the project is suitable for use and complies with the approved standard.
    Conducting safety inspections on site where no Safety Officer is assigned, and providing instructions and information to the Project Manager.
    Providing information and advising project management on safety and health requirements and promoting a regular exchange of information on current safety performance record.
    Maintaining the subcontractor’s safety performance and advising the Project Manager on subcontractor’s safety performance record.
    Conducting site safety audits and ensuring that any safety violations observed are immediately corrected and that the employees responsible for the violation are educated and supervisors cautioned and instructed on the proper method of work.
    Issuing HSE alerts for all reported medium & high potential incident and the potential near misses; establishing HAZOP, ALARP.
    Spearheading the risk assessment as per method statement for specific task & completing risk assessment address meeting for workers

Languages

  • English Conversation

  • Malayalam Native

  • Hindi Conversation

Followers (1)

Hives