Organized and detail-oriented Warehouse Specialist with 16 years of experience ensuring streamlined operations by carefully managing Material, Equipment, Manpower, Shipment schedules and Inventory.

Experience

  • Material Controller

    at Petrofac International Limited

    February 2018 - September 2018

    Muḩāfaz̧at al Aḩmadī

    • Managed Piping, Electrical & Instrumentation Bulk Materials for Project – Lower Fars Heavy oil Development • Compiled Centralized Database of Material Take off (MTO), Packing Lists (PL), Material Test Certificates (MTC) & Manufacturers Data Report (MDR). • Expedited material from suppliers to ensure timely delivery as per shipping plan & PO agreement. • Projected / Forecasted the volume of flow in material & incorporated equipment, manpower and extra laydown. Rented additional containers when required. • Facilitated & Liaised with Fabrication shop, Mechanical, Piping, E&I contractors and ensured material for construction plan • Mended operational problems by working closely with management & narrowed down drawbacks. • Managed daily receiving, issuing, Laydown location in advance

  • Senior Material Supervisor

    at Special Technical Services LLC

    February 2017 - May 2017

    Ash Sharqiyah South

    • Lead on-site Material Control of project, Daleel Gas Processing facilities. • Provided direction and expertise in implementing Warehouse Procedure in a fast-paced project • Served as a primary liaison between Project management, Procurement & Supply chain departments. • Frequently engaged with contractor materials management personnel • Managed project material on centralized software JD-Edwards-Oracle. • Accelerated efforts for material required as per Project Plan. • Talked to vendors directly to pace up the supply • Emphasized on 100% Material checking, inspection & storing. • Took Special care of Hazardous chemicals with A/C storage. • Undergone audit from Ministry with an appreciation letter.

  • Material Controller

    at TOZZI Industries srl Italy (COMART S.p.A)

    June 2015 - August 2016

    ‘Ajmān

    • In charge of onsite Material Control & Warehouse Department (Project-6 Modules @300Ton) • Designed Warehouse Procedure with QC and ensured contractor compliance. • Systemized complete control of material from receiving, distribution to fabrication, movement of spools to painting, testing & construction site. • Frequently interacted with client, contractor & subcontractor. • Acted as an Interface between Procurement, POSE, Vendors, Client, Management, Construction, Engineering, QA/QC, Subcontractors for all material related issues. • Prioritized material availability as per individual isometric & module. • Regularly visited yard for witnessing material inspection, compliance of contractor with procedure related to stacking, storage (Outside, under shade or AC), SS&CS storage techniques, Tagging, Color coding. • Complied to HSE policy of client.

  • Warehouse Superintendent

    at Saipem

    December 2013 - September 2014

    Distrikt Paramaribo

    • Recruited as the company’s only employee transferred from Saudi Arabian Saipem to Suriname Saipem. • Selected by the Suriname Saipem’s Project Manager & Construction manager, due to extra ordinary accomplishment of handling 55000 Ton piping material with a small team in Saudi Arabia. • Instrumental in streamlining the irregularities created by unskilled personnel, prior to my arrival. • Reorganized the entire laydown with designated areas for Piping, Electrical & Instrumentation, Chemicals. • Emphasized on area allocation for valve testing, quarantine material & A/C storage. • Trained, Motivated and Lead a team of 60 personnel to reach mechanical completion on time. • Selected, trained & encouraged group of semiskilled, to handle individual areas to improve accuracy & speed.

  • Senior Material Controller

    at Saipem

    April 2008 - September 2013

    Minţaqat ar Riyāḑ

    • Organize manpower and Equipment required for everyday activities at Warehouse. • Expedite material with POSE dept & International Vendors. • Report Material arrival status, shortages to Client, Management, Dept heads, Engineers & Procurement team (Daily, weekly) • Maintain Centralized Computer record on SICON-MAGA Software (% Received, % issued, % Shortage). • Maintain Centralized soft copies of MDR, MTC, Third party RN, COC • Review Shipping Documents (PO, PL, COO, INVOICE, DN, Shipping Notice) • Coordinate with QC Dept for inspections. • Create Material documents for client final approval (MRR & Supporting documents) • Assess, Record and report shipping damages for replacement or back charges for onsite repair. • Follow up OSD & NCR with international vendors. • Organize Receiving, Checking, Issuing & record all activity.

  • Material Coordinator

    at Special Technical Services L.L.C. EMC Division

    September 2005 - February 2008

    Az̧ Z̧āhirah

    • Onsite material head, responsible for implementing QMS for material (Project-Engineering & maintenance contract). • Analyze PO for scope of material supply. • Extracted MTO and forwarded to client for availability. • Raised PR for client shortage material. • Made optimal use of client’s surplus materials by physically verifying. • Reported weekly for shortages and followed-up for shortages. • Addressed shortages with extra efforts, by coordination with other sites under same contract. • Physically verified for material specifications, sizes, tags and allocate in yard locations. • Drafted Material receiving checklist as per site requirements. • Notified QC for client inspection with supporting documents (Local Purchase Order (LPO), Packing List (PL), Material Take off (MTO), Delivery Note (DN), Material Test Certificate (MTC), Material receiving checklist). • Clear any Non-Conformance Report (NCR) with vendor & Procurement support.

  • Material Controller

    at Impian Tekad SDN BHD

    February 2002 - July 2005

    Perlis

    • Onsite Material Lead (client supply material) – Piping, E&I, Mechanical Equipment, Spools, Structure relating to HRSG, Boiler, Turbines, Generators of Power plants • Absolute responsibility since material arrived on site to issuance for erection. • Ensured material is safely offloaded, segregated, checked & stored in designated location • Successfully Organized containers with racks as storage. • Curbed loss in material by pressing for a gated yard. • Organized Maps of material boxes on yard for easy tracking • Instrumental in changes to issue voucher formats & smooth flow of material. • Acted as an interface between client and company for all material related matters. • Generated material received reports (MRR) for client and company. • Maintained BOM, raised shortages on weekly reports.

Education

  • Bachelor of Mechanical Engineering

    at Motilal Nehru National Institute of Technology

    1996 - 2000 (4 years) Allahābād - Uttar Pradesh

Languages

  • English Negotiation

  • Hindi Negotiation