Experience

  • CAD operator

    at TEPSCO/ Tokyo Electric Power Services Company

    September 2015 - at Present

    Toshkent Shahri

    Project Implementation Consultant for Turakurgan Thermal Power Station Construction Project

  • Heating engineer

    at ENKOM

    March 2014 - September 2015

    Toshkent Shahri

    Design of boiler plants. Development of thermo-mechanical units. Development of the documentation of the internal gas. Selection of equipment. Participated in the project: "Boiler Minor Mosque, boiler-house (2.4MW) in Tashkent", "Boiler TTZ1(6.0 MW), TTZ-2(6.0 MW), TTZ-3(5.0 MW), TTZ-4(4.5 MW), 5-TTZ(10.0 MW), TTZ-6(8.0 MW), TTZ-7(1.6 MW) in Tashkent" boiler-houses in the cities: Chirchik(1.5 MW), Chimkent(2.4 MW), Nukus(6.0 MW), Termez(12 MW), Bekabad(2 MW), Karshi(8 MW), Tashkent(1.2MW).

  • Design engineer

    at METROPROEKT

    January 2013 - September 2015

    Toshkent Shahri

    Designing of underground, road, rail and hydraulic tunnels. Participated in the project: "South Rokada, road section with tunnel in Moscow", "st.Bittsevsky Park, ground metro lobby in Moscow," "st.Lesoparkovaya, underground station in Moscow", "Kozhukhovskaya line, tunnel construction in Moscow "," st.Marina Grove, metro lobby with shopping centre in Moscow "," st.Zorge, underground station in Rostov-on-Don ", " st. Malinowski, underground station in Rostov-on-Don".

  • Leading specialist for capital construction

    at Ministry of Emergency Situations of the Republic of Uzbekistan

    May 2012 - October 2012

    Toshkent Shahri

    Technical Supervision. . Compiling collation statements, technical supervision over capital construction objects. Participated in the project: "ICD, 3- storey building in Kibray", "ESD, 2-storey building in Tashkent", "Emergency Situations Ministry, command checkpoint and gate in Tashkent," "Headquarters, Kamchik pass."

  • Engineer estimator

    at PROGRESS GOLD MONTAJ

    April 2010 - February 2011

    Toshkent Shahri

    Documenting, compiling collation statements, calculation of volumes for estimating and invoicing.

Education

  • Civil engineer

    at Tashkent Institute of Architecture and Construction

    2010 - 2012 (2 years) Toshkent Shahri

  • Civil Engineer

    at Tashkent Institute of Architecture and Construction

    2006 - 2010 (4 years) Toshkent Shahri

Knowledge and keywords

Hives