Experience

  • Sr. Electrical Design Manager

    at NKY

    May 2015 - July 2019

    Minţaqat ar Riyāḑ

    • Resolve and ensure that contractors rectify deficiencies in the permanent works as reported by the concerned departments prior to acceptance of and transfer of the permanent works to the Client. • Attend a bi-weekly meeting with the contractor, and preparing a report on the meeting. • Coordinate between the construction and contractors’ engineering teams ensuring that all requirements are conveyed clearly and delivered upon. • Lead testing and commissioning of electrical installations and equipment and follow-ups. • Take part in project and risk management reviews. • Witness all testing, pre-commissioning, commissioning, and start-up activities ensuring adherence to approved plans and procedures. • Review tests results generated by the independent test agencies, and approves those complying with the specification requirements

  • Operation and Maintenance / Electrical General Manager

    at EFS (EMCOR )

    November 2012 - May 2015

    Makkah Province

    Facility Management of KAUST( King Abdullah University of Science and Technology PROJECT SAUDI ARAMCO Associate. )university and down town KAUST University AREAS OF RESPONSIBILITIES • 200 km 15KV MV network including dry and wet Utililies, •1 Main & 3 satellite substation , •220 peakage substations ,MV/LV cable splicing ,terminations, •GIS , RMU's ,MV/LV switchgears ,DB, •Central Battery, UPS, •Cranes, •Hvac, ahu, fahu, chillers , air compressors • SWRO (Sea Water Reverse Osmosis Potable Water Treatment ) Plant with capacity to produce a Peak Daily Consumption (PDC) of 32 ML/day, • Central CHILLER Plant with the cooling capacity of approximately 45,000 tons and •WWTP (Waste Water Treatment ) Plant with a peak hourly flow of approximately 38,000 m3 per day. • 3 Storm lift stations, •8 Waste water lift stations,

  • Sr. Electrical Construction Manager

    at Nesma and Partners

    December 2006 - October 2012

    Minţaqat ar Riyāḑ

    Oct 2009 - Oct , 2012 Riyadh EPC contract Construction of OLAYA TOWERS (48,52 floors high rise towers GOSI RIYADH Project includes HV/MV switch gears and cables , transformers , bus ducts , generators , Synchronous generators ,ATS , ups , CCMS / SCADA , Motor control Centers ,AFD /VFD/VSD , motor and pump soft starters ,grounding & lightening systems , power and lighting control panels , power distribution systems , lighting system , dimming control , aircraft warning lights , BMS , DCS ,HVAC , Fire Alarm , public announce , pava , telephone/data , CCTV , IP camera , smatv , IPTV , access control , central battery system , access control ,jet fans , facade lighting , hvac control ,medium voltage and love voltage duct banks and trenches Dec 2006 - Oct 2009 Thuwal, Saudi Arabia SAUDI ARAMCO Associate. EPC contract, Construction of KING ABDULLAH UNIVERSITY underground utility and Thuwal Down Town 3200 villas , shops , malls , clinics , fire stations and UTILITIES