Experience

  • Site Engineer

    at SIEMENS Pakistan

    July 2002 - at Present

    Punjab

    To prepare the works schedule and distribute the work to electrical supervisors. 2. Monitor the progress of electrical team and guide them on electrical problems. 3. Installation of Traffic signal lights, Street Lights, LV distribution panels, distribution boxes (inside & outside of the building), telecoms distribution boxes. Installation of cable trays, ladders, baskets and conduits. Installation of indoor type and outdoor type Lighting Fixtures ( Street Lighting & Traffic Signals). 4. Installation of Power cables in trenches outside the building and in cable trays and ladders inside the building and their terminations. 6. Participating in weekly progress meetings of the project.

  • Sr. Electrical Engineer

    at INMA Contracting Co., (EPC Contracting. Co. KSA)

    January 2013 - April 2018

    Makkah Province

    1. Technical Evaluation of Electrical Material Technical Submittals to get approval from consultant. 2. Preparation of Electrical Equipment BOQ for Bid Tender packages (Generators, Transformers, MV Switchgears & DC System, LV Switchgear, Power Factor Panels, MV/LV Bus ducts, UPS system etc. 3. Compilation of Tender Documents I.e Drawings, Project specs, BOQ, Consultant Comments, RFI’s. 4. Preparation of Technical response against consultant comments and Re-Submittal of material submittals to the consultant. 5. Arrangement to get the approval of the material samples required by the consultant. 6. After samples approval from consultant, preparation of material take offs & BOQ. 7. Review of Quotations and preparation of comparative statement. 8. Preparation of the material order requests & follow up till final release of the order. 9. Arranging and attending meetings with Venders/ Client. 10. Preparation of weekly progress reports to submit to high ups.

  • Sr. Project Engineer

    at Arabian BEMCO f

    April 2009 - December 2012

    Minţaqat ar Riyāḑ

    1. To execute the project activities by ensuring all applicable health & safety standards. 2. Coordinate with design team, clients and vendors to clarify the drawings/site issues. 3. Estimates, prepares and assigns the resources such as manpower, materials, consumables, tools, etc., required for electrical related works prior to execution. 4. To prepare the works schedule and distribute the work to electrical supervisors. 5. Supervision for the installation of Duct Banks, Cable Trays & Ladders, Conduit Systems, Transformers, MV/LV Switchgears. MV /LV Cable , Control cable & Termination. 7. Installation of LV DBs , DC Battery Banks, Charger/Inverter & DC DB’s. 8. Ensure the co-ordination in between Civil, Mechanical and Electrical activities to avoid any conflict at later stage of the executed work. 9. Ensures that all the site works done are in accordance with the approved construction drawings, quality standards, specifications and contract documents.

  • Project Engineer

    at WATEEN Telecom Pvt. (Ltd.)

    July 2006 - April 2009

    Punjab

    1. Installation of distribution Transformers, Gensets & ATS Panels, DB’s & MDB’s, Dist, Power cables, Cable Trays/Ladder, UPS & Battery banks and Grounding. 2. Low Current System installlation.i.e FACP, CCTV, access control. 3. Supervision of construction works & Electro-Mechanical works on telecoms sites. 4. To attend the progress meetings with project management team in head office. 5. Follow up for new electricity connections ( Transformers) from WAPDA. 6. To arrange meetings with electrical contractors & follow up to review the periodical project progress. 7. To ensure that all installations are as per drawings / project standards & specs.

  • Assistant Engineer Maintenance

    at NTDC-WAPDA Pakistan

    November 2002 - July 2006

    Islāmābād Capital Territory

    1. Manage the proactive Maintenance of Substation Equipment like Transformers, circuit breakers, compressors, Motors, MV/LV switchgears and panels, DC Batteries and DC Chargers, Generators and HVAC System. 2. Carryout proper sequence of operation during shutdowns from 500KV transformers to 11KV feeders. To arrange the shut downs for routine maintenance (annually) and emergency maintenance on Power Transformers/Breaker including washing and cleaning of insulator posts of C.T’s, P.T’s & Transformer bushings. Toping up of oil level if required. Dismantling of Faulty Equipment & Installation of their replacement. 3. Measurement of Contact Resistance & opening / closing timing of breakers and isolators. Earth resistance testing of all the equipment and structure. 4 Inspection, cleaning & lubrication of mechanical parts. Verification of local remote operation of all the equipment. Tightening of Nuts & Bolts, clamps & structure.

Education

  • Safety Certificate

    at PP-10

    2009 - 2010 (1 year) Minţaqat ar Riyāḑ

  • B,Sc Electrical Engineering

    at University college of engineering , MIRPUR , AJK

    1996 - 2001 (5 years) Azad Kashmir

  • HSSC

    at H-9 Islamabad

    1992 - 1994 (2 years)

  • SSC

    at HIGH SCHOOL

    1989 - 1990 (1 year) Punjab

Languages

  • English Negotiation

  • Urdu Native

Hives