logoSign upLog in
imran khan

imran khan

• Preparing & drafting the drawings: - • (By taking the actual measurements on site.) • New critical spare parts manufacturing drgs. Develop in order to insure timely procurement of critical spares as per requirement of varies departments including Captive Power Plant. (To collect the data & measurement from site and drafting the drawings in AutoCAD) • As built, Foundation & Erection, Proposal drawings, General arrangements, Assembly and pipe & chutes drawings. • (All drawings are drafting in AutoCAD latest Ver.2009 format

Relevant