Experience

  • Senior Process Engineer, Lead

    at Equinox Engineering Ltd.

    November 2014 - at Present

    Alberta

    Heat and Mass Balance, Technical Reports, PFDs, P&IDs, Pipeline Hydraulic, Equipment Specification, Process Calculations, Control Narrative, Shutdown keys, HAZOP Review and Close Out, LDT, Review vendor packages, for Slug Catcher, Liquid-liquid Separator, Stabilizer, Sour Gas Sweeting – Amine Unit, Refrigeration, Inlet/Sales Gas Compressor, Acid Gas Injection, LPG storage, Utility System; VRU, Flare, HM, FG, PSV • Keyera Compressor Station Feed Project • Encana Keybob 15-31 Gas Plant Phase 3, Feed and Detail Design Project • Apache Wapiti Gas Plant Feed Project

  • Senior Process Engineer

    at Li’s Process Consulting Service Inc

    May 2013 - at Present

    Alberta

    Fertilizer Plant Trouble Shooting, Safety Study and Pressure Relief Valve Sizing • Canadian Fertilizers Ltd. 1850 TPD Ammonia Plant System Safety Study • CF - Terra Nitrogen Port Neal Complex Urea Plant Trouble Shooting • KOCH FERTILIZER CANADA ULC, Urea Plant System Safety Study

  • Process Engineer, Lead

    at SNC-LAVALIN Inc.

    November 2000 - at Present

    Alberta

    Process simulation with HYSYS, Sulphur plant modeling with SulSIM, PFDs and PIDs development, Process equipment & Instrument specification, Line sizing and hydraulic calculations, PSV and Flare system design with FLARENET, Process Study, HAZOP Review • Enbridge Pipeline 2006 Capital Project • Enbridge Pipeline Tank 15 Replacement Project • Husky Energy Lloydminster Upgrader Debottleneck Project • TransAlta Boiler 31F-2 Igniter Upgrade Project • Husky Energy Rainbow Lake Plant Salt Water VRU • Petro-Canada Refinery Tank Farm 2 Phase 2 Project • Trans Mountain Pipe Line Company, Corridor Pipeline Project

  • Senior Process Engineer, Lead

    at WorleyParsons Ltd.

    May 2012 - October 2014

    Alberta

    H&M Balance, PFDs, PIDs, Process Description and Control Narrative, Equipment Specification, Pipeline Hydraulic Calculation, LDT, Shutdown Key, HAZOP Review and Close Out, Construction Support • Husky Oil Operation Ltd - Husky Midstream Alliance Projects • Kuwait Oil Company – Low Fares Heavy Oil Development Project

  • Senior Process Engineer, Lead

    at Wood Group, IMV Projects Inc.

    November 2010 - April 2012

    Alberta

    Heat and Mass Balance, DBM, PFDs, P&IDs, equipment and Instrumentation calculations and datasheets, shutdown keys, LDT, HAZOP Review and Close Out, Control narrative, Package specification and vendor design review • Shell Saturn Water Hub Project EDS and Detail Design • Shell Sunset Water Hub Project EDS and Detail Design • Gordondale Gas Plant EDS and Detail Design

  • Senior Process Engineer, Lead

    at WorleyParsons MEG, Ltd.

    August 2008 - October 2010

    Alberta

    Process Unit Modeling, BFDs, PFDs, P&IDs, Hydraulic Calculation, Equipment Specification, operation and control philosophy, HAZOP Review • Suncor Energy Inc., Fort McMurray • Pengrowth OilSands EDS & Detail Design Project

  • Senior Process Engineer, Lead

    at Jacobs Canada Inc.

    September 2006 - August 2008

    Alberta

    BFDs, PFDs, P&IDs, equipment and Instrumentation specification / evaluation, HAZOP action report and close out • Suncor Firebag FB3+ Detail Design • BP HAZOP and PSM Audit Item Resolution Project

  • Process Engineer, Lead

    at BANTREL Co.

    January 2006 - August 2006

    Alberta

    Boiler Feed Water treatment study, hydraulic calculation, control philosophy design, existing process system revamp and new equipment and control specification, BFDs, PFDs, P&IDs, HAZOP review • Suncor MNU project EDS (Engineering Design Specification) and Detail Design

  • Process Engineer

    at CPPEI, PLANNING & ENGINEERING INSTITUTE OF CHINA NATIONAL PETROLEUM CORPORATION (CNPC)

    July 1994 - August 2000

    Beijing Shi

    Gas Plant, Refinery, HYSYS simulation, pipeline calculation, PFD, PIDs, Process calculations and equipment data sheets, Selected the Pipeline route, Reviewed vendor documents, on-site technical service, Commission/Start-up, PSV and flare system design, HAZOP •Natural Gas Gathering Pipeline Networks Calculation Programming •West-East Natural Gas Pipeline Feasibility Study •Xinjiang Refinery Natural Gas Fractionation Station Detail Design •Russia-China Oil Pipeline Pre-Feasibility Study •Zhuozhou Oil Terminal Detail Design •Beijing Liquid Petroleum Gas (LPG) Station Detail Design •Beijing Transit Company LPG / LNG Refilling Station Detail Design •Vaporizing LPG / LNG and Mixing Air Station Detail Design •Kuwait Oil Company Production Facilities Expansion Detail Design •Russia-China Gas Pipeline Pre-Feasibility Study •Heavy Oil Transportation with Light Oil Injecting Feasibility Study •Heavy Oil Transportation Thru Water-Circle Pipe in North-East Of China Feasibility Study

Education

  • Professional Engineer

    at APEGA

    2005 - at Present (13 years) Alberta

  • University of Petroleum

    at Chemical

    2000 - at Present (18 years) Beijing Shi

  • University of Petroleum

    at Chemical

    1994 - at Present (24 years) Beijing Shi

Languages

  • English Negotiation

  • Chinese Native

Followers (6)

Hives