Experience

  • Senior Piping Designer

    at WSP Calgary

    October 2013 - January 2015

    Alberta

    Cenovus Energy Inc. - Narrows Lake SAGD Central Processing Facility (Water Treatment Area) 3D equipment/piping layout design and modeling (disposal water air cooler, lime sludge centrifuge, pumps, tanks, sumps, water/air filters, heaters, etc.); Vendor information (equipment outline drawings and data) checking and markup; Stress/IFC isometric drawing generating, drafting and self-checking; Bill of material generating and checking. Software used in project: Bentley AutoPLANT / AutoCAD / Autodesk Navisworks Simulate

  • Senior Piping Designer

    at WorleyParsons Calgary

    September 2006 - September 2013

    Alberta

    Project Done: Devon Canada Corporation – Ferrier Central Processing Facility. Enbridge Pipeline Inc. – Fort Hills FEED. Spectra Energy Corp. – Dawson Processing Facility & Fort Nelson North Processing Facility. Suncor Energy Inc. – Firebag Stage 3 Well Pads and Gathering Lines & Firebag Pipelines Project (FBPLP), Hot Bitumen Pipeline Facilities, Terminus 3 and Hotbit Metering Facility (HBMF). Petro-Canada – Fort Hills Bitumen Reproduction CS&S (Concept Screening & Selection). 3D equipment/piping layout design and modeling ; Vendor drawing review and markup; Stress/IFC isometric drawing generating, drafting and self-checking; P&ID markup and update; Piping GA key plan, P&ID and PFD drawing generating, drafting, self-checking and updating; Plot plans’ updating; Developing plan and profile drawings for underground water system; Piping valve and material take-off; Specialty item and special piping support drafting, etc.

  • Intermediate Piping Designer

    at Jacobs Canada

    September 2003 - August 2006

    Alberta

    Petro-Canada – RCP-1 Project (Edmonton Refinery Conversion Project). 3D equipment/piping modeling (exchangers, pumps, steam condensate system, manifolds etc.) Pipe rack modularization study; Vendor files review and mark-up; Stress/IFC Isometric generating, drafting and self-checking; 3D model review coordination; AutoPLANT P&ID drafting, self-checking and auditing; LDT Maintaining/updating; Specialty item list maintaining and updating. BA Energy Inc. - Heartland Upgrader Project. P&ID, PFD, UFD drafting, self-checking and checking; LDT Maintaining/updating. Petro-Canada – EDD (Edmonton Diesel Desulphurization). AutoPLANT P&ID drafting and self-checking; Tie-in isometric drawing drafting, modifying and self-checking; Plot plan maintaining/updating.

  • Junior Piping Designer/Drafter

    at Fluor Canada

    May 2001 - March 2003

    Alberta

    Petro-Canada – RCP-1 Project (Edmonton Refinery Conversion Project). AutoPLANT P&ID drafting and self-checking; 3D modeling plant layout arrangement for front-end study. Syncrude Canada Ltd. – UE-1 Project (Upgrader Expansion Project). Piping demolition isometric drawings drafting and self-checking; Plot plans drafting, modifying and self-checking; LDT Maintaining/updating; Piping isometric spool coordinating; Fort McMurray field piping tie-in points inspecting; CWP documents coordinating.

Education

  • Diploma

    at SAIT

    1999 - 2001 (2 years) Alberta

  • Engineering Design and Drafting Technology

    at SAIT

    1999 - 2001 (2 years)

Languages

  • English Negotiation

  • Chinese Native

Hives