Ingénieur
5 ans responsable de production industrielle
7 ans consultant supply chain
Je souhaite mettre mes 12 années d'expérience dans la gestion des opérations au service d'un acteur incontournable du monde industriel.

Experience

  • Production Manager

    at Gardner Aerospace

    February 2013 - June 2018

    Midi-Pyrénées

    Head of Production and Maintenance - 2 yrs 5 mos Assumed full responsibility for managing all production activities including inspection and maintenance. Supervised 150p and directed all employee disciplinary and training programs. •Steering committee board member •Ensured production activities performance and compliance •Managed production people, means and capex budgets •Ensured interface between production and Site Director •Ensured application of HSE site regulations •Participated to main plant improvement projects Business Unit Production Manager 1 yr 4 mos Assumed full responsibility for managing all production activities including inspection, ordering, planning and subcontracting (100 people) for serial programs. Autonomous production unit manager - 1 yr 10 mos Assumed full responsibility for managing the hard metal sheet detailed parts unit activities: production, inspection, ordering, planning, subcontracting and production engineering (50 people)

  • Consultant

    at Excent

    January 2012 - February 2013

    Midi-Pyrénées

    Mission for STELIA AEROSPACE – Aeronautics – 1 year and 1 month - Mazères, Auxerre, Clermont Ferrand (France) Was assigned as customer representative to critical supplier plants for trouble shooting actions. Secured internal supplier production plans to improve on time and on quality deliveries. Outcomes: +20% improvement OTD, internal production monitoring tools rolled out for suppliers

  • Consultant

    at Accenture

    June 2011 - December 2011

    Midi-Pyrénées

    Mission for AIRBUS – Aeronautics – 6 months - Toulouse (France) Supported Manufacturing Engineering Department for A400M aircraft. Harmonized process and prepared for ramp up.

  • Consultant

    at AGAP2

    October 2008 - June 2011

    Île-de-France

    Mission for ALSTOM POWER SYSTEMS – Nuclear energy – 10 months – Paris Was post-order coordinator at NUEG procurement department. Ensured for 10M€ of purchased material for safety generators destined to nuclear power plants (Olkiluoto, Taishan, Hongyanghe, Ningde and Flamanville). Followed up costs, quality and on time deliveries. Outcomes: OTD 98% Mission for GE POWER CONVERSION FRANCE – Energy – 5 months – Haridwar, Delhi (India) Was assigned as customer representative to Reynold India Ltd sites for trouble shooting activities regarding 25 water chillers fabrication and delivery follow up destined to ADCOP project (Abu Dhabi Crude Oil Pipeline) Mission for SAIPEM – Oil & Gas – 1 year and 6 months – Saint Quentin en Yvelines (France) Was post-order coordinator at procurement department. Ensured for 20M€ of purchased material destined to OML58 project (TOTAL gas treatment plant in Nigeria). Followed up costs, quality and on time deliveries. Outcomes: OTD 95% on commission site

  • Consultant

    at KLB Group

    November 2005 - September 2008

    Île-de-France

    Mission for SAFRAN LANDING SYSTEMS - 10 months – Naples Was assigned as consultant to Magnaghi site within Safran mft. Rolled out monitoring tools and best practices to manage supplier sub-contracting activities. Mission for SAFRAN TRANSMISSION SYSTEMS – 6 months – Turin Was assigned as customer representative to Teksid Aluminum smelting plant within Safran mft. Secured raw castings manufacturing and on time deliveries for BR710 Rolls Royce engine program. Outcomes: Recovery plan held at 75%, 25% lead time reduction, 25% scrap parts reduction. Mission for SAFRAN LANDING SYSTEMS – 6 months – Naples Was assigned as customer representative to Magnaghi Aeronautica SpA site, ensured ATR 42/72 aircraft main landing gears detailed parts fabrication and assembly follow up for OTD improvement. Mission for ALCATEL-LUCENT ENTERPRISE – 12 months– Vélizy Was commodity buyer for frame and connectors (20M€) at Purchasing department. Outcomes: 15% saving

Education

  • Master degree of engineering

    at INSA Val de Loire

    2000 - 2005 (5 years)

Languages

  • French Native

  • English Negotiation

  • Italian Negotiation

  • Swedish Negotiation

  • German Elementary

Hives